You'll find that our IDPX exam questions frequently feature detailed scenarios and practical problem-solving exercises that directly mirror industry challenges. Engaging with these IDPX sample sets allows you to effectively manage your time and pace yourself, giving you the ability to finish any Interior Design Professional Exam practice test comfortably within the allotted time.

Question # 4

A residential client wants to build an addition that would occupy the entire side-yard. What is the interior designer responsible for checking before proceeding?

A.

soils report

B.

access route

C.

setback requirement

D.

neighborhood agreement

Question # 5

The specification of which item is within the scope of work for interior designers when designing for water conservation?

A.

ultra-low flow faucets

B.

vegetated roof system

C.

rainwater collection cisterns

D.

FSC certified wood products

Question # 6

How are the actual riser and tread dimensions for a set of stairs determined?

A.

Divide floor opening by desired tread dimension

B.

Divide floor opening by desired riser dimension

C.

Divide floor-to-floor height by minimum riser dimension

D.

Divide floor-to-floor height by maximum riser dimension

Question # 7

During construction, the general contractor notices conflicting information between the construction drawings and the specifications. The FIRST step the contractor should take is to

A.

issue a change order

B.

make an interpretation

C.

notify the owner of the discrepancy

D.

notify the designer of the discrepancy

Question # 8

A project is running behind schedule and over budget. What should the designer do FIRST?

A.

Review and determine budget cuts with the client

B.

Simplify installation methods to save both cost and time

C.

Contact the client to discuss the problem as soon as possible

D.

Rank construction priorities and complete the critical path elements first

Question # 9

A university is renovating the restrooms (washrooms) of a dormitory built in 1963 and is required to reduce the water usage by 20%. What is MOST important when specifying plumbing fixtures?

A.

durability & Green Seal fixtures

B.

cleanability & Energy Star fixtures

C.

accessibility & WaterSense fixtures

D.

sustainability & International Plumbing Code compliant fixtures

Question # 10

What are the three parts of a Construction Specification Institute (CSI) specification?

A.

general, products, execution

B.

allowance, alternate, application

C.

information, purchasing, installing

D.

requirements, finishes, construction