Spring Sale Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: buysanta

Exact2Pass Menu

VCE Vblock™ Systems Deployment and Implementation - Core Exam

Last Update 7 hours ago Total Questions : 128

The VCE Vblock™ Systems Deployment and Implementation - Core Exam content is now fully updated, with all current exam questions added 7 hours ago. Deciding to include 210-010 practice exam questions in your study plan goes far beyond basic test preparation.

You'll find that our 210-010 exam questions frequently feature detailed scenarios and practical problem-solving exercises that directly mirror industry challenges. Engaging with these 210-010 sample sets allows you to effectively manage your time and pace yourself, giving you the ability to finish any VCE Vblock™ Systems Deployment and Implementation - Core Exam practice test comfortably within the allotted time.

Question # 4

Using PowerPath/VE, which two details are expected outputs from the rpowermt display dev=all command? (Choose two.)

A.

logical device ID

B.

serial number for the connected storage array

C.

initiator ID

D.

Fibre Channel switch details

Question # 5

On a Vblock System 720, what is the VCE supported tool used to manage a storage array?

A.

Unisphere for VMAX

B.

Ionix ControlCenter

C.

Symmetrix System Viewer

D.

Symmetrix Management Console

Question # 6

In Cisco Unified Computing System Manager (UCSM), which selection under the Admin tab would you select to configure SNMP?

A.

Call Home

B.

Communication Services

C.

Management Interfaces

D.

Syslog

Question # 7

When performing hardware maintenance on a Cisco UCS B-Series blade, which GUI parameter should be selected before removing the blade out of the chassis?

A.

Remove

B.

Re-acknowledge

C.

Decommission

D.

Diagnostic Interrupt

Question # 8

You are backing up a Cisco UCS configuration.

Which parameter should you select to retain assigned vHBAs, WWPNs, vNICs MACs, WWNNs, and UUIDs?

A.

Retain Identities

B.

Preserve Identities

C.

Include Identities

D.

Copy Identities

Question # 9

You are deploying a Vblock System and you are unable to log in to the vCenter server using single sign-on (SSO).

Which two steps should be verified? (Choose two.)

A.

Log in credentials are correct.

B.

vCenter server is licensed.

C.

vCenter services are started.

D.

The single sign-on server is licensed.

Question # 10

During a Vblock System 320 deployment, the implementation engineer needs to access UCS Manager to verify the compute configuration.

Which two IP addresses are used to open the GUI? (Choose two.)

A.

the primary switch IP address

B.

the secondary switch IP address

C.

the virtual IP address

D.

the CIMC IP address

Go to page: