Summer Sale Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: buysanta

Exact2Pass Menu

Nokia Advanced Optical Network Design

Last Update 8 hours ago Total Questions : 40

The Nokia Advanced Optical Network Design content is now fully updated, with all current exam questions added 8 hours ago. Deciding to include 4A0-255 practice exam questions in your study plan goes far beyond basic test preparation.

You'll find that our 4A0-255 exam questions frequently feature detailed scenarios and practical problem-solving exercises that directly mirror industry challenges. Engaging with these 4A0-255 sample sets allows you to effectively manage your time and pace yourself, giving you the ability to finish any Nokia Advanced Optical Network Design practice test comfortably within the allotted time.

Question # 1

Consider an OTN-based network controlled by GMPLS. Which of the following statements is correct?

A.

An OCH LSP can be routed through an ODU LSP.

B.

An ODU LSP can be routed through an OCH LSP.

C.

An ODU LSP is routed between two photonic layer nodes.

D.

The routing of the individual ODU frames is based on their label

Question # 2

Which of the following is recommended to reduce the latency of a 30km long link?

A.

DCM-free amplifiers

B.

Soft-decision FEC

C.

Low-noise amplifiers

D.

L1 encryption

Question # 3

Which of the following statements about Raman amplification is FALSE?

A.

Amplification occurs along the fiber

B.

Chromatic dispersion within the fiber is increased.

C.

Flat gain can be achieved in any transmission band.

D.

OSNR is improved compared to EDFAs permitting lingers spans

Question # 4

Which of the following statement about guaranteed restriction (GR) in generalized Multiprotocol label Switching (GMPLS) is correct?

A.

GR use reestablished backup LSPs with resources reserved and configured.

B.

GR can achieve 100% survivability for a single-failure scenario only.

C.

GR does not required the signaling of the fault to trigger the restoration.

D.

GR calculates a new backup LSP every time a failure occurs.

Question # 5

Consider the exhibit that shows the OTN frame structure . Which of the following sets of label is correct?

A.

OUT: B: ODU: C: OPU: D: OPU

B.

OUT: B: ODU: C: OPU: D: OCH

C.

OPU: B: OTU: C: ODU: D: OPU

D.

ODU: B: OYU: C: OPU: D: OPU

Question # 6

Which of the following best describes Four Wave Mixing (FWM)?

A.

FWM is a linear impairment that produces crosstalk four adjacent wavelengths are used.

B.

FWM is a non-linear impairment that produces crosstalk at the sum and difference of two wavelengths.

C.

FWM is a non-linear impairment resulting from varying velocities at different frequencies.

D.

FWM is a linear impairment resulting from pulses broadening over ultra-long distances

Question # 7

Refer to the exhibit that shows a demand matrix, a network topology with candidate links (in thick blue lines and dashed lines), the defined network in thick blue lines and the demand routing (colored numbers in the figure). Every link is 80 km long. Which of the following requirements is supported by this network design with the displayed demand routing?

A.

1+1 protection

B.

Minimum cost design

C.

Minimum latency

D.

Resilience against two link faults

Question # 8

Which of the following statements about power commissioning system is most accurate?

A.

A system must be either linear or a ring.

A system can stop if there is a through communication in a node.

B.

A system must be a ring only

A system can stop if there is a through connection in a node.

C.

A system must be a ring only

A system cannot stop if there is a through connection in a node.

D.

A system must be either linear or a ring

A system cannot stop if there is a through connection in a node

Question # 9

Which of the following statements about Bit Error Rate (BER) is correct?

A.

BER is the ratio of redundant bits to correct bits.

B.

BER is measured at both the transmitted and receiving ends.

C.

BER can be measured before after the FEC decoding.

D.

BER can be accurately measured in a short period of time , for any rate.

Question # 10

Consider the exhibit, where the two highest ports are OT line ports. Which of the following statements is correct?

A.

The OCH protection is implemented.

B.

The O-SNCP protection is implemented.

C.

The E-SNCP protection is implemented.

D.

An OPS is required upstream (left of the OT).

Go to page: