You'll find that our CTFL-PT_D exam questions frequently feature detailed scenarios and practical problem-solving exercises that directly mirror industry challenges. Engaging with these CTFL-PT_D sample sets allows you to effectively manage your time and pace yourself, giving you the ability to finish any ISTQB Certified Tester Foundation Level - Specialist Performance Testing practice test comfortably within the allotted time.
Identify the correspondences between performance measures and metrics (1 -6) and the different environments (A C) in which performance evaluation is needed.
1. Alerts and warnings.
2. Concurrency of usage.
3. Operational processes.
4. Resource utilization.
5. Response time.
6. Throughput of data, transactions, and other units of work performed.
1. Operating environment.
2. Business environment.
3. Technical environment.
SELECT ONE OPTION
Given the following list of approaches to load generation, select the load generation approach that is LEAST reproducible and accurate.
SELECT ONE OPTION
What are the main activities of performance test execution?
1. Monitoring all parts of the environment.
2. Setting up the load generation and monitoring tools.
3. Collecting and keeping all results and information related to the test.
4. Generation of a load against the SUT according to a load profile.
5. Parameterize the test scripts.
6. Setting up the system under test.
SELECT ONE OPTION
(REFER TO BASE SCENARIO 2): When you refer to Base Scenario 2. you are referring to the description and only the description, without any modification.
Question specific constraints: (specific constraints are not part of the Base Scenario and are specific to this question).
• Natalie should make a presentation to the business stakeholders In order to explain the performance test plan.
Question
Which ONE of the following options contains information that should be included in Natalie's presentation to the business stakeholders?
SELECT ONE OPTION
(REFER TO BASE SCENARIO 2): When you refer to Base Scenario 2, you are referring to the description and only the description, without any modification.
Question specific constraints: (specific constraints are not part of the Base Scenario and are specific to this question).
Throughout the month of January (31 days), the company performed 3,100 departure operations from the Capital City Airport. These departure operations transported 465,000 passengers during the hours of operation, from 07:00 to 23:00.
The departing passengers (one of the most relevant operational profiles) will access the front-end of the application to check in for their flight. It is known that 30% of departing passengers reconnect after checking in to request the boarding pass to be resent or printed.
Question
How many departing passengers access the front-end per hour?
SELECT ONE OPTION
Identify the correspondences between the communication protocols used most frequently (listed from 1 to 5) in performance testing and the categories to which they belong to (A to C).
1.REST.
2. HTTP.
3. JDBC.
4. SOAP.
5. HTTPS.
1. Web service.
2. Database.
3. Web.
SELECT ONE OPTION
Which of following statements (listed I. to V.) are TRUE in characterizing result verification and error handling in a performance test script?
1. It is not necessary to verify that the script Is doing what It is supposed to do using Indirect methods, such as a database check.
2. The scripts should always include logical rules.
3. Manual intervention may be required to carry out remedial action in the event of an error.
4. Performance scripts should be subject to quality control and testing, just like any software product.
5. The default error handling of the performance test tools Is sufficient, so no additional checks need to be introduced.
SELECT ONE OPTION
Scenario
James is participating in a project In which a web portal is being developed to sell tickets for different types of events.
Once the sale has been made and confirmed by the payment channel, the information must be available to the rest of the types of user (for example, the managers of each event) In a maximum time of 2 seconds (It Is expected that this temporal constraint will be met in 95% of the transactions and that 90% of the transactions will be completed at 100%).
Ticket sales take place during a time window (start date and time, end date and time) that is announced in advance. At the beginning of this window, there are peaks of 150 users per minute, for 5 minutes.
Question
Choose the option that enables James to meet the performance target.
SELECT ONE OPTION
Select the option that identifies the possible causes of the degradation of a system's response over time during dynamic performance testing.
1. Disk fragmentation.
2. Network latency.
3. File repository growth.
4. Memory leaks.
5. Inadequate database design.
SELECT ONE OPTION
Identify the activity that is NOT part of the performance test preparation.
SELECT ONE OPTION