You'll find that our E20-594 exam questions frequently feature detailed scenarios and practical problem-solving exercises that directly mirror industry challenges. Engaging with these E20-594 sample sets allows you to effectively manage your time and pace yourself, giving you the ability to finish any Backup and Recovery - Avamar Specialist Exam for Implementation Engineers practice test comfortably within the allotted time.

Question # 11

Which EMC Avamar policies are part of a group?

A.

Dataset, Schedule, and Retention

B.

Profile, Dataset, and Schedule

C.

Clients, Profile, and Retention

D.

Clients, Schedule, and Dataset

Question # 12

Which component should be stopped and started, before and after specifying the e-mail home smtp server?

A.

MCS

B.

gsan

C.

EMS

D.

dtlt

Question # 13

By default, where are the EMC Avamar files located on a Solaris client?

A.

/opt/AVMRclnt

B.

/opt/lib/avmrclnt

C.

/usr/sbin/AVMRclnt

D.

/opt/bin/avmrclnt

Question # 14

An EMC Avamar customer wants to run garbage collection outside the blackout window. What may prevent the garbage collection job from starting?

A.

Restores are running.

B.

System is running in degraded mode.

C.

HFS check is running.

D.

There is no garbage to collect.

Question # 15

Which type of restore can a user perform with EMC Avamar Desktop/Laptop?

A.

To the client from which the data originated

B.

To any client managed by EMC Avamar

C.

With Administrator privileges, to any client

D.

To any client in the enterprise

Question # 16

Which is the last step in the hardware installation portion of an EMC Avamar multinode deployment?

A.

Connecting to the customer network

B.

Cabling the nodes to the switch

C.

Powering on the nodes

D.

Placing nodes in the rack

Question # 17

A multinode EMC Avamar server is backing up clients throughout the world. Each geographical area has a domain and a domain administrator to manage the backup clients in their domain.

What must each domain administrator keep in mind to help ensure that backup schedules do not conflict with the EMC Avamar server blackout window?

A.

Time basis for a backup schedule is the local time of the Avamar Administrator console session

B.

Time basis for clients is the local time of the Avamar server utility node

C.

Time basis for the gsan and the administrator server is the local time zone where the server resides

D.

Time basis for the maintenance schedules is always GMT