You'll find that our H13-629 exam questions frequently feature detailed scenarios and practical problem-solving exercises that directly mirror industry challenges. Engaging with these H13-629 sample sets allows you to effectively manage your time and pace yourself, giving you the ability to finish any HCIE-Storage (Written) practice test comfortably within the allotted time.

Question # 51

What kind of technology in an active-active disaster recovery solution can realize the traffic distribution between servers in different regions on the wide area network (including the Internet), keeping access quality with the best server from your nearest customer?

A.

GSLB

B.

VIP

C.

SLB

D.

GLB

Question # 52

A customer production center is in Chengdu with a disaster recovery center in Shenzhen, using VIS 6600T remote replication capabilities to meet the remote disaster recovery. Which of the following about the VIS6600T copy function is correct?

A.

DCM (data change map) is mainly used to ensure that the data in the production center is copied to the disaster recovery center according to the order sent by the host to ensure the data consistency

B.

Production, disaster recovery data volume and disaster recovery must be consistent, the name can be inconsistent

C.

Each business configuration a copy volume group, multiple copy volume group can use the same virtual IP

D.

virtual IP and physical IP must be in the same network segment

Question # 53

Which of the following is incorrect regarding the VTL6900 data deduplication featuree?

A.

The SIR cluster of the VTL6900 supports global deduplication

B.

The deduplication start time of the VTL6900 can be controlled automatically according to the policy

C.

VTL6900 on the specified tape deduplication and remote replication is recommended at the same time

D.

VTL6900 deduplicated tape to do data archiving, the physical tape library in the NC is still non-deduplicated data

Question # 54

Which of the following statements are a correct description of the CIFS agreement? (multiple choice)

A.

CIFS does not allow multiple clients to access

B.

The CIFS client writes the shared file and does not write to the storage system immediately. Instead, the file is saved in the local cache and can be read againImprove read rate, improve performance

C.

CIFS does not support anonymous transmission and shared authentication access

D.

CIFS supports a variety of character sets to ensure CIFS can be used in all language systems

Question # 55

The OceanStor 18000 system used by a client business application has a total of three pools, each of which is a 9-disk RAID5. Someday analyzing the log of business interruption, we found that there are some scenarios in the system that caused the failure. What will cause the host access to the stored business in the following scenario? (Multiple choice.)

A.

In the fully redundant group environment, occurred the master reset.

B.

With the BST (bad track) feature turned off, a BST bad track appears on the LUN.

C.

The POOL where the business is located is all thin LUN and not a snapshot. LUN copy, clone and copy services are configured in the log POOL, which is a space full of print information.

D.

Log in the following print:2014-01-19 08:04:40} {Receive a disk-fault event of the disk (328) of pool (2) from ctrl.}2014-01-19 08:40:35} {Receive a disk-fault event of the disk (613) of pool (3) from ctrl.}

Question # 56

The MTTR indicator is used to describe the average continuous time of the failure of a product during operational use or testing.

A.

True

B.

False

Question # 57

A research unit purchased a Huawei Oceanstor 9000 storage products, the main configuration products: 8 * Oceanstor 9000 C node, the front end 10GE * 2, CE6850 switch * 2, S5700 switch * 1, cables, lighting and other accessories are fully furnished, households communication deployment program, prepared in advance a list of IP planning programs and IP requirements. Which of the following IP address is needed? (Multiple choice.)

A.

The customer needs to provide 16 IP addresses for Oceanstor 9000 system back-end IP and need to provide a gateway.

B.

Customers need to provide nine management network IP addresses, of which eight for IPMI management, one for OM management.

C.

The customer management network must be interoperable with the OceanStor 9000 InfoEqualize DNS IP to access the OceanStor 9000 storage.

D.

The client needs to provide 49 IP addresses that can interoperate with client applications, 16 for the static front end, 32 for the dynamic front end, 1 for InfoWqualizer DNS IP.

Question # 58

Information of the disaster recovery research Beijing project mainly includes three aspects (Who / What / Why) description. Which of the following is true? (Multiple choice.)

A.

A bank has more than XX customers and XX corporate customers.

B.

Loss of data will result in substantial loss of business interruption and may also result in significant financial loss.

C.

Business interruption has a huge impact, and the interruption time of business deployment < 2h.

D.

Customers want to build two live-action data centers in the same city and realize double-live of the key business systems. The disaster recovery plan RPO = 0, RTO = 0

Question # 59

The InfoEqualizer DNS IP address needs to be the same as the OceanStor 9000 front-end network and customer application network for network interoperability

A.

Correct

B.

mistakes

Question # 60

VTL 6900 engines A and B nodes form a cluster, on the A, B node between the business bearer and the fault automatically switch, which of the following description is correct? (Multiple choice)

A.

When the node a is found through the sms -v command, the status of the IPStor Authentication Module is FAIL. The service of the node A will be from Move to Node B.

B.

unplug the A node power supply, A node's business will automatically switch to the B node

C.

unplug the A node and the backup server network connection, the A node's business will automatically switch to the B node

D.

A, B nodes can work in Active-Active mode, but can only manually achieve the backup service load balancing between A and B nodes