Spring Sale Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: buysanta

Exact2Pass Menu

HCSP-Field-Data Center Facility V1.0

Last Update 3 hours ago Total Questions : 60

The HCSP-Field-Data Center Facility V1.0 content is now fully updated, with all current exam questions added 3 hours ago. Deciding to include H20-923_V1.0 practice exam questions in your study plan goes far beyond basic test preparation.

You'll find that our H20-923_V1.0 exam questions frequently feature detailed scenarios and practical problem-solving exercises that directly mirror industry challenges. Engaging with these H20-923_V1.0 sample sets allows you to effectively manage your time and pace yourself, giving you the ability to finish any HCSP-Field-Data Center Facility V1.0 practice test comfortably within the allotted time.

Question # 1

The UPS5000-H-1200 kVA and UPS5000-H-1600 kVA have two power cabinets and one bypass cabinet, and are equipped with the MDU, ECU, and surge protection box.

A.

True

B.

False

Question # 2

Which O & M practice is most effective for identifying cooling inefficiency caused by airflow problems in an operating data center?

A.

Disable temperature sensors to prevent false alarms

B.

Compare rack inlet temperatures, return air temperatures, and fan speed trends to detect recirculation and bypass

C.

Lower supply air temperature to the minimum possible value at all times

D.

Run humidification continuously regardless of ambient conditions

Question # 3

After installing the FusionCol8000-C (110–440 kW), inject water to preserve the pressure for the chilled water pipes to how many MPa. After 30 minutes, check that no leakage occurs. Preserve the pressure for 24 hours. If the pressure drop is less than 0.01 MPa and no leakage occurs, the pipes do not leak.

A.

0.8

B.

0.5

C.

1

D.

1.2

Question # 4

When the outdoor unit is installed at a position higher than the indoor unit, install an oil trap every five to six meters in the vertical direction along the gas pipe to ensure system reliability.

A.

True

B.

False

Question # 5

After the unit is powered on for the first time, it enters the compressor preheating state. To quickly perform power-on commissioning, you can manually shut down the compressor preheating.

A.

True

B.

False

Question # 6

During wizard startup, when you enter the screen for selecting commissioning items for the first time, all items are selected by default. Which item is mandatory. You can deselect other commissioning items that are not mandatory.

A.

Commissioning the indoor fans

B.

Commissioning the condensate pump

C.

Commissioning the humidifier

D.

Commissioning the cooling system

Question # 7

The NetEco can be deployed on any virtualization platform.

A.

True

B.

False

Question # 8

In an in-room solution that adopts overhead air supply through air ducts, the net height of each floor must be greater than or equal to how many meters?

A.

4

B.

6

C.

5

D.

3

Question # 9

Which of the following conditions will not cause the wizard startup commissioning to fail?

A.

The condensate pump is stuck.

B.

The indoor fan 2 drive is faulty.

C.

The electronic expansion valve is not opened.

D.

The water leakage rope is not installed.

Question # 10

Which of the following interfaces is used to connect the controller and the main control module of the unit?

A.

DP

B.

USB

C.

SW

D.

I2C/12v

Go to page: