You'll find that our H12-425_V2.0 exam questions frequently feature detailed scenarios and practical problem-solving exercises that directly mirror industry challenges. Engaging with these H12-425_V2.0 sample sets allows you to effectively manage your time and pace yourself, giving you the ability to finish any HCIP-Data Center Facility Deployment V2.0 practice test comfortably within the allotted time.

Question # 4

Which of the following menus can be used by engineers to manually add devices on the NetEco?

A.

Data center planning

B.

Report management

C.

Alarm management

D.

System management

Question # 5

If multiple SmartLi battery cabinets are combined, press and hold the POWER ON/OFF button on each battery management module for more than 2s, and then switch on the battery circuit breaker in any cabinet to start all battery cabinets.

A.

True

B.

False

Question # 6

When connecting chilled water pipes for the NetCol8000-C, fill water and preserve pressure 8 hours after the conversion adapter is connected.

A.

True

B.

False

Question # 7

Which features of Huawei integrated UPS can reduce the footprint?

A.

Intelligent alternating hibernation technology

B.

High power density design

C.

Hot swap

D.

Installation against a wall

Question # 8

When will the bypass module of Huawei integrated UPS to start to work?

A.

Both the active and standby ECMs are abnormal.

B.

The power module overload times out.

C.

The UPS works in ECO mode, and the bypass voltage is within the preset range.

D.

The UPS is lust powered on and the inverter is not started.

Question # 9

A data center is at the Tier IV level and uses Huawei FusionModule2000 smart module. In this smart module, the PDU8000 integrated PDF cannot be used to supply power to IT loads and precision air conditioners at the same time because isolation requirements are not met.

A.

True

B.

False

Question # 10

Due to simple operations and easy interconnection, which of the following communication types is recommended for NetEco northbound integration?

A.

WebService

B.

SNMP

C.

FTP

D.

PoE