You'll find that our H19-311 exam questions frequently feature detailed scenarios and practical problem-solving exercises that directly mirror industry challenges. Engaging with these H19-311 sample sets allows you to effectively manage your time and pace yourself, giving you the ability to finish any Huawei Certified Pre-sales Associate- Data Center Facility practice test comfortably within the allotted time.

Question # 4

If the UPS5000-E (50 kVA power module) backs up power without derating, it is unreasonable to configure () 12 V batteries.

A.

34

B.

36

C.

38

D.

40

Question # 5

The output power factor of the UPS5000-A-400/500K is (), which can be applicable to new IT loads and greatly improve the loading capacity.

A.

0.9

B.

0.95

C.

0.8

D.

1

Question # 6

Conformal coating can effectively reduce the failure rate of the UPS in severe conditions/ including salt mist, dust, and high temperature and humidity, which ensures its service life in severe conditions.

A.

TRUE

B.

FALSE

Question # 7

If the total current of a battery string is 1,000 A and three battery strings are configured, the most economic cable configuration between the main switch box and the branch switch box is ():

A.

95 mm2 (328 A) x2

B.

120 mm2 (382 A) x 2

C.

150 mm2 (441 A) x 2

D.

185 mm2 (506 A) x 1

Question # 8

The height of the UPS5000-E (25-75 kVA) power module is only 2U.

A.

TRUE

B.

FALSE

Question # 9

What UPS configuration method does the Fusion Mod ule800 support? ()

A.

N/2N

B.

N/N+1

C.

N/N+1/2N

Question # 10

The THDV of the UPS5000-A at full linear loads is ().

A.

0.01

B.

0.02

C.

0.03

D.

0.05