You'll find that our 1z0-448 exam questions frequently feature detailed scenarios and practical problem-solving exercises that directly mirror industry challenges. Engaging with these 1z0-448 sample sets allows you to effectively manage your time and pace yourself, giving you the ability to finish any Oracle Data Integrator 12cEssentials practice test comfortably within the allotted time.

Question # 21

You are setting up the topology for an infrastructure with three different environments: Dev, QA, and Prod. How must you create Logical Schemas? (Choose the best answer.)

A.

Create one Logical Schema per Physical Schema.

B.

Create one Logical Schema per Physical Schema that stores the same type of data.

C.

Create one Logical Schema per Data Server.

D.

Create one Logical Schema per Context.

Question # 22

You want to draw directly in the data flow all the details about how the different servers involved are connected, in order to load a specific table by using ODI.

What must you do to accomplish this? (Choose the best answer.)

A.

In the ODI Interface palette, choose the more convenient graphic objects to link the involved servers.

B.

You need not draw directly in the data flow all the details about how the different servers involved are connected. ODI automatically designs the flow and how servers are connected.

C.

You need not draw directly in the data flow all the details about how the different servers involved are connected. The code will be the black box generated directly by ODI.

D.

You must draw directly in the data flow all the details about how the different servers involved are connected, and also specify with variables the passwords for connecting to the data contained in the servers.

Question # 23

Which statement is true about the IKM SQL Control Append that creates an intermediate integration table prefixed with I$ ? (Choose the best answer.)

A.

The intermediate integration table prefixed with I$ is required to determine which records must be inserted.

B.

If Flow Control is not necessary, an I$ table is not created .

C.

The intermediate integration table prefixed with I$ is created because the flow control is mandatory when doing an initial load.

D.

Neither the LKM nor the IKM create intermediate tables. Most of their work is performed in the ODI Agent memory.

Go to page: