You'll find that our ACP-600 exam questions frequently feature detailed scenarios and practical problem-solving exercises that directly mirror industry challenges. Engaging with these ACP-600 sample sets allows you to effectively manage your time and pace yourself, giving you the ability to finish any Project Administration in Jira Server practice test comfortably within the allotted time.

Question # 11

John needs to configure an Issue Collector where he is the reporter of all the collected issues.

Which two permissions does he need to do this? (Choose two.)

A.

Administer Projects

B.

Transition Issues

C.

Assignable User

D.

Create Issues

E.

Add Comments

Question # 12

A Jira project uses a single issue type.

Alana complains that she is not able to see the custom field Approval Board when she views a specific issue.

She can see the field on other issues in the project.

You check the screen configuration and confirm that the field is on the correct screen.

Why does Alana NOT see the field on that specific issue?

A.

The field is hidden in the field configuration.

B.

The field was disabled by a Jira administrator.

C.

The field has no value at the moment.

D.

The field is hidden by the workflow status.

E.

The field is hidden by a security level.

Question # 13

View the extract of a Jira Software Scrum project ' s permission scheme shown.

The project uses a simplified workflow.

Who can drag and drop issues to the Closed column on the board?

A.

only the board administrator

B.

any user with Jira Software application access

C.

nobody

D.

any logged in user

E.

only members of the Administrators project role

Question # 14

Fixing a single bug requires the involvement of three teams: Designers, Developers and Testers.

Currently, all the fields that are needed by each of the three teams are together on a single project screen. As a project administrator, how can you help the teams to easily identify the fields they need?

A.

Request a separate issue type and issue type scheme for each team.

B.

Use the card colors feature to color-code the fields by team.

C.

Make fields available only for the team that needs them.

D.

Request individual team screens to be associated with the Edit Issue operation.

E.

Group individual fields by team and place them on separate tabs.

Question # 15

Teresa is able to see the Start Progress transition but not the Approve transition on an issue. Her co-worker is able to see both.

Identify two possible causes why Teresa can NOT see the Approve transition. (Choose two.)

A.

Teresa is not listed in the correct security level for the issue.

B.

Teresa does not have the Transition Issues permission.

C.

Teresa is not in the correct group or project role.

D.

Teresa does not meet the condition on the Approve transition.

E.

Teresa does not have the correct global permission.

F.

Teresa does not have the correct Application access.

Question # 16

For the DEV project, Max has these requirements relating to time logging:

    I need to be able to edit time logs.

    I need to be able to delete time logs.

Which three project permissions does Max need in order to meet these requirements? (Choose three.)

A.

Schedule Issues

B.

Edit All Worklogs

C.

Move Issues

D.

Delete All Worklogs

E.

Work On Issues

F.

Edit All Comments

Question # 17

You work for an insurance company and want to use Jira for tracking customers and their contracts. Before requesting a new project you have gathered some requirements:

    Each customer can have multiple contracts.

    Each contract can have an independent status.

    Each contract will be worked on by a different agent.

    Contracts cannot exist without a corresponding customer.

How should contracts be configured?

A.

as fields on a screen

B.

as sub-task issue types

C.

as tabs on a screen

D.

as workflow statuses

Question # 18

Below you are shown an extract of a field configuration used by all issue types in your project.

The field ' A detailed description ' is a custom field of type Text field (multi-line). Which two statements are true? (Choose two.)

A.

Users will be able to format text in the field.

B.

The field can only be used in combination with the Description system field.

C.

The field is mandatory in each issue type used in the project.

D.

The project is configured to use only a single screen.

E.

The maximum text length is limited to 100 characters.

Question # 19

When creating a project from a template, which two schemes will be unique for the new project? (Choose two.)

A.

Notification Scheme

B.

Issue Security Scheme

C.

Permissions Scheme

D.

Issue Type Scheme

E.

Field Configuration Scheme

F.

Workflow Scheme

Go to page: