You'll find that our API-SIEE exam questions frequently feature detailed scenarios and practical problem-solving exercises that directly mirror industry challenges. Engaging with these API-SIEE sample sets allows you to effectively manage your time and pace yourself, giving you the ability to finish any Source Inspector Electrical Equipment practice test comfortably within the allotted time.

Question # 11

Which MCC feature is specifically listed in the guide as part of design/construction review?

A.

Main isolating switch

B.

Exciter brush rigging

C.

Conservator diaphragm

D.

Generator slip rings

Question # 12

NEMA rated motor controllers require a minimum range of conductor sizes for a specific size controller. Which of the following conductor sizes is appropriate for a Size 2 controller?

A.

2/0 AWG -250MCM at 60°C rated cable and 2/0 AWG -350MCM at 75°C rated cable

B.

2-2/0 AWG at 60°C rated cable and 2-4/0 AWG at 75°C rated cable

C.

10-2/0 AWG at 60°C rated cable and 10-4/0 AWG at 75°C rated cable

D.

10-4 AWG at 60°C rated cable and 10-6 AWG at 75°C rated cable

Question # 13

According to API 541, for the bearing temperature rise test, motor bearing stable temperature is defined:

A.

by the manufacturer's FAT procedure.

B.

as a change of not more than 1°C in 30 minutes.

C.

as a rise of not more than 1°C in one hour.

D.

as a rise of not more than 2°C in one hour.

Question # 14

Which switchgear-related item is explicitly identified in the guide table of contents as an inspection topic?

A.

Cable tray color coding

B.

Metering

C.

Turbine nozzle alignment

D.

Firewater pump casing hardness

Question # 15

What is the interrupting rating of a piece of equipment?

A.

The peak current rating that a device has been certified to interrupt

B.

The symmetrical current rating that a device has been certified to safely interrupt

C.

The crest current rating that a device has been certified to safely interrupt

D.

The load current rating that a device has been certified to interrupt

Question # 16

According to API RP 540, threaded conduit joints for explosionproof connections should be made with at least how many fully engaged threads?

A.

2

B.

3

C.

4

D.

5

Question # 17

According to NFPA 70, the number of bends permitted between pull points for rigid metal conduits RMC shall not be more than:

A.

the equivalent of six quarter bends.

B.

the equivalent of four quarter bends 360 degrees total.

C.

four bends provided the radii is less than 5 times the conduit diameter.

D.

four bends provided the bend radii is at least 10 times the conduit diameter for conduit greater than 3/4 inch 19 mm.

Question # 18

In addition to maximum rated voltage, manufacturer’s name, trademark and AWG, which of the following markings is required for all conductors and cables?

A.

NEC class

B.

Country of origin

C.

Batch or lot number

D.

Wire type designator

Question # 19

What is the purpose of an insulation resistance reading?

A.

To evaluate the insulation and condition of the grounding

B.

To determine the resistance of the conductors

C.

To evaluate the condition of the insulation between conductors and ground

D.

To determine if the conductors are properly terminated

Question # 20

A source inspector reviewing a control panel should verify wiring against which project document as a core inspection activity?

A.

Employee training log

B.

One-line wiring diagram

C.

Freight invoice

D.

Packing list only