Question # 4

What can you use heuristics in Advanced Planning (PP/DS) for?

A.

To optimize costs and times in production plans

B.

To solve planning problems for defined objects

C.

To automate material movements in material staging

D.

To set default values in production master data

Full Access
Question # 5

What does a line hierarchy in repetitive manufacturing represent?

A.

A production line with more than one work center

B.

A production line with prioritized work centers

C.

A production line with a parallel sequence in the routing

D.

A production line with an alternative sequence in the routing

Full Access
Question # 6

Which of the following are possible configuration steps when setting up the alert monitor in Advanced Planning? Note: There are 2 correct answers to this question.

A.

Create an object selection variant for priority-category-related alerts.

B.

Assign the alert profile to the overall profile.

C.

Create an object selection variant for production-planning-related alerts.

D.

Assign the overall profile to the authorization profile.

Full Access
Question # 7

You want to insert an operation at a certain time on a work center in the graphical planning table. The planning direction is forward. The planning direction is forward. The desired dispatching time coincides with an operation that has previously been dispatched, how does the insertion take place?

A.

The new operation is inserted at the desired time; the previous dispatched operation is moved forward.

B.

The new operation is inserted at the desired time; the previously dispatched operation is moved backward

C.

The previously dispatched operation stays as is; the new operation is inserted after the dispatched operation.

D.

The previously dispatched operation stays as is; the new operation is inserted before the dispatched operation.

Full Access
Question # 8

How can you characterize dependent requirements in material requirements planning?

Note: There are 2 correct answers to this question.

A.

They are created with exact times in Advanced Planning.

B.

They are created when an independent requirement is created for the finished product.

C.

They are created on assembly level during the planning run.

D.

They are only created for multilevel bill of material (BOM) structures

Full Access
Question # 9

Which master data object governs the relationship between supply source and demand source in the Kanban process?

A.

Replenishment strategy

B.

Production supply area

C.

Control cycle

D.

Rate routing

Full Access
Question # 10

Where do you maintain data to determine the duration of an operation for production? Note: There are 2 correct answers to this question.

A.

Routing

B.

Work Center

C.

Bill of material (BOM)

D.

Material Master

Full Access
Question # 11

Mode selection is one of the scheduling options available with Advanced Planning in SAP S/4HANA. When can you use mode selection?

A.

When multiple production versions are maintained for one product

B.

When multiple operations are maintained for one product

C.

When alternative resources are used within one operation

D.

When multiple planned orders exist on one resource

Full Access
Question # 12

Your company produces a finished good based on a forecast and expects it to be in stock when customers order it. If customers order more than the forecasted quantity, this must NOT have any impact on the production program. Which planning strategy do you use?

A.

Make-to-stock production (10)

B.

Planning with final assembly (40)

C.

Make-to-stock production (20)

D.

Planning without final assembly (50)

Full Access
Question # 13

Your quality department detects a deviation in a raw material batch. Unfortunately, this batch has already been used in production. How can you identify all affected finished goods stocks?

Note: There are 2 correct answers to this question.

A.

Use the Batch Information Cockpit.

B.

Use batch derivation.

C.

Use batch determination

D.

Use the batch where-used list.

Full Access
Question # 14

How can you set up a material as a phantom assembly?

Note: There are 2 correct answers to this question

A.

Define the special procurement type inside the material master.

B.

Change the item category of the phantom assembly in the bill of material •—' (BOM)

C.

Define the special procurement type inside the BOM

D.

Change the phantom item indicator for the phantom assembly in the bill of material (BOM)

Full Access
Question # 15

Your production planners must execute planning only for specific resources. How can you achieve this in Advanced Planning (PP/DS)?

A.

Use a propagation range.

B.

Use a resource group

C.

Use a planning area.

D.

Use a planning group.

Full Access
Question # 16

How can you support a GMP (Good Manufacturing Practice)-compliant production process?

Note: There are 3 correct answers to this question.

A.

Approved resources

B.

Digital signature

C.

Batch record

D.

GMP-compliant flag

E.

Recipe approval

Full Access
Question # 17

Which business processes are affected by settings in the order-type-dependent parameters?

Note: There are 2 correct answers to this question.

A.

Check material availability.

B.

Schedule production orders.

C.

Define integration with cost accounting.

D.

Select master data.

Full Access
Question # 18

Which of the following processes lead to an entry in the MRP planning file?

Note: There are 3 correct answers to this question.

A.

Changing the storage bin in warehouse management

B.

Changing the procurement type in the product master

C.

Changing the operation times in the production data structure

D.

Changing the stock in inventory management

E.

Changing the purchasing contract in materials management

Full Access
Question # 19

During production order creation, several valid production versions are found. How does the system choose the production version?

A.

Lot size or material cost

B.

Validity period or sales order

C.

Planned order or material number

D.

Alphanumeric or quota arrangement

Full Access
Question # 20

You have maintained the parameters for simple discontinuation in the material master of a component. Which business process will be affected if the available stock is zero and the discontinuation date is in the past?

A.

Kanban

B.

Material requirements planning

C.

Backflushing

D.

Production order release

Full Access
Question # 21

You want to create a production order. What methods can you use?

Note: There are 2 correct answers to this question.

A.

Create by order release

B.

Convert a purchase requisition

C.

Create in Kanban process

D.

Create without material

Full Access
Question # 22

Your project uses process orders for the production of liquid chemicals. What can you define to ensure that production flow only happens in suitable and physically connected tanks? Note: There are 2 correct answers to this question.

A.

Resource matrix

B.

Resource network

C.

Resource hierarchy

D.

Resource selection

Full Access
Question # 23

If the stock level drops below the reorder stock in reorder point planning, what logic would the system use to trigger procurement?

A.

Fill up to the maximum stock level.

B.

Fill up to the safety stock level.

C.

Fill up based on the lot size procedure.

D.

Fill up to the reorder stock level.

Full Access
Question # 24

in your Plant, MRP is activated.

which options do you have to exclude a material from the MRP run?

Note: there are 2 correct answers to this question.

A.

Use a specific material status

B.

Use a specific material group

C.

Use a specific MRP type

D.

Use a specific MRP list

Full Access