You'll find that our CFM exam questions frequently feature detailed scenarios and practical problem-solving exercises that directly mirror industry challenges. Engaging with these CFM sample sets allows you to effectively manage your time and pace yourself, giving you the ability to finish any Certified Facility Manager practice test comfortably within the allotted time.

Question # 21

Both the facility and IT managers are asked to assign staff to work together on a major project . Halfway through the project, a power struggle emerges due to divergent views . How should the managers initially intervene?

A.

Reestablish meeting guidelines

B.

Reassign additional members from each department

C.

Reassign project managers

Question # 22

What is the MOST effective tool in managing change?

A.

Managing resistance.

B.

Anticipating user denial.

C.

Using surveys.

D.

Communication.

Question # 23

Which type of equipment maintenance program can cause the most unplanned downtime and least predictable costs?

A.

Preventive.

B.

Predictive.

C.

Corrective.

D.

24-hour.

Question # 24

Which is the MOST important best practice to ensure a successful safety culture?

A.

Go beyond statutory requirements.

B.

Lead by example.

C.

Utilize technology to streamline safety training and enforcement.

D.

Prioritize safety.

Question # 25

What is a facilities register?

A.

A list of accounts representing the contracted services for a facility.

B.

A comprehensive list of the organization’s facility assets, including buildings, grounds, and infrastructure.

C.

An integrated work management system utilized in a facility to track preventative and on-demand work orders.

D.

A master list of emergency contacts for use in business continuity/emergency purposes.

Question # 26

In an indoor office environment, what is the MOST common complaint received by the facilities department?

A.

Indoor air quality

B.

Heating and cooling

C.

Janitorial issues

D.

Ergonomics issues

Question # 27

In addition to vision, incentives, action plan, and resources , what is required for the process of change management to be effective?

A.

Directives

B.

Experience

C.

Skills

Question # 28

What is the MOST effective exposure control to prevent occupational hazards and protect workers?

A.

Elimination, where the hazard is physically eliminated.

B.

Personal protective equipment, where the worker is protected.

C.

Engineering controls, where people are isolated from the hazard.

D.

Administrative controls, which change the way people work.

Question # 29

A facility manager has implemented a room scheduling system to improve workplace utilization and bundle services into a single transaction. Which two technologies BEST complement room scheduling technologies?

A.

Locally installed room scheduling devices and radio frequency identification (RFID) chips

B.

Power over Ethernet (PoE) switches and electronic mail

C.

Electronic booking system and locally installed room scheduling devices

Question # 30

What does a Cost Plus to a Guaranteed Maximum Price (GMP) contract signify?

A.

The Contractor is selected based on final drawings and his own costs and the individual subcontractors ' costs. No cost increases are allowed beyond the GMP.

B.

The Contractor is selected based on GMP price of the final drawings and can charge the project based on all invoices produced plus its Fee & General Conditions costs.

C.

The Contractor is selected early in the project based on its Fee and its General Conditions costs and provides a GMP once drawings are more developed.