You'll find that our CMRP exam questions frequently feature detailed scenarios and practical problem-solving exercises that directly mirror industry challenges. Engaging with these CMRP sample sets allows you to effectively manage your time and pace yourself, giving you the ability to finish any Certified Maintenance & Reliability Professional practice test comfortably within the allotted time.

Question # 11

In a Total Productive Maintenance (TPM) program what is autonomous maintenance?

A.

Proactive maintenance as a result of condition monitoring

B.

Maintenance that is carried out by the production department

C.

Maintenance performed while the asset is in production

D.

Planned preventive maintenance such as lubrication

Question # 12

Motor Circuit Analysis (MCrA) on a low (450-600) voltage 3 Phase motor reveals significantly higher capacitance-to-ground than baseline values. Resistance-to-ground readings are good. What does this indicate and/or what should you do?

A.

The motor contains abnormally high moisture and/or conductive contamination. Continue normal operation, but plan follow-on MCrA readings and possible corrective action.

B.

Remove motor-from service and send to shop to be cleaned, dried, dipped and baked, since this is the surest way to corrective problem.

C.

Do not start the motor. An "explosive" shorting condition could cause near instantaneous winding failure.

D.

No problem exists. Take no action.

Question # 13

What analysis process can best be used to perform a gap analysis?

A.

Risk analysis

B.

Benchmarking

C.

Root cause analysis

D.

Fishbone diagram

Question # 14

What is a standard methodology to reduce or increase the frequency of a PM inspection?

A.

Risk Based Inspection (RBI)

B.

American National Standards Institute (ANSI)

C.

American Petroleum Institute (API)

D.

American Society of Mechanical Engineers (ASME)

Question # 15

A reliability block diagram is used in the analysis of plant machinery:

A.

availability.

B.

OEE (Overall Equipment Effectiveness).

C.

downtime.

D.

productivity.

Question # 16

When developing and presenting a new strategic plan to stakeholders, which of the following is the most important?

A.

Implementation timetable

B.

Gaining the trust of stakeholders

C.

Craft (trade) flexibility

D.

Establishment of a common goal

Question # 17

Maintainability is defined as:

A.

a characteristic of a system or product design .that pertains to the ease, accuracy, safety and economy in the performance of maintenance functions ^

B.

a characteristic that pertains to the amount of time the machinery/equipment will be available when needed

C.

a characteristic that pertains to the efficient conversion of labor, raw material and energy into an on-specification product where the ratio of output to input is optimal

D.

the probability that an item will carry out its stated function adequately for the time interval when operating according to the design function

Question # 18

A maintenance superintendent (manager) has just joined the company and has read the company's statement of strategic direction in which it says. "Our most important goal is to increase the return on capital investment in our plants (facilities). All management incentive compensation will be reflected in the achievement of this goal" The new superintendent (manager) has asked the plant (facility) manager for a copy of the plan to achieve the company's goal The plant (facility) manager explains that such a plan does not exist, nor is there time to do one. The best next step for the superintendent (manager) should be to:

A.

Wait until the plant (facility) manager develops a plan to improve return on capital investment and then develop the maintenance plan.

B.

Develop a program to defer maintenance tasks to reduce expenses and increase return on capital investment.

C.

Discuss the role of maintenance in improving return on capital investment with the head of manufacturing.

D.

Develop and present a maintenance plan to increase return on capital investment to management.

Question # 19

Of the choices below, which is the best way to evaluate the effectiveness of a Safety Program?

A.

Measure the number of safety slogans and bulletins posted

B.

Periodic safety audits of work processes in the field

C.

Review health and safety performance as required

D.

Solicit feedback about safety performance from employees

Question # 20

To be trusted by all members of a group, a facilitator must:

A.

be a member of the group.

B.

not prefer any potential solution.

C.

have decision making authority.

D.

be acceptable to most of the group.