You'll find that our CTAL-TAE exam questions frequently feature detailed scenarios and practical problem-solving exercises that directly mirror industry challenges. Engaging with these CTAL-TAE sample sets allows you to effectively manage your time and pace yourself, giving you the ability to finish any ISTQB Certified Tester Advanced Level, Test Automation Engineering practice test comfortably within the allotted time.

Question # 11

Which of the following practices can be used to specify the active (i.e., actually available) features for each release of the SUT and determine the corresponding automated tests that must be executed for a given release?

A.

Feature-driven development

B.

The use of feature files

C.

Test-driven development

D.

The use of feature toggles

Question # 12

In a first possible implementation, the automated test scripts within a suite locate and interact with elements of a web UI indirectly through the browsers using browser-specific drivers and APIs, provided by an automated test tool used as part of the TAS. In an alternative implementation, these test scripts locate and interact with elements of the same web UI directly at the HTML level by accessing the DOM (Document Object Model) and internal JavaScript code. The first possible implementation:

A.

Has a lower level of intrusion than the alternative implementation, and therefore its test scripts are less likely to produce false positives

B.

Has a higher level of intrusion than the alternative implementation, and therefore its test scripts are less likely to produce false positives

C.

Has a lower level of intrusion than the alternative implementation, and therefore its test scripts are more likely to produce false positives

D.

Has the same level of intrusion as the alternative implementation, and therefore the risk of test scripts producing false positives is the same in both cases

Question # 13

Some automated regression test scripts run by a TAS in a given test environment make calls to private APIs that require authentication for all requests (the authentication method is the same for all APIs). The SUT is a business-critical system. The following two changes are planned: a change in the authentication method of all APIs and a minor upgrade of the OS (Operating System) in the test environment. You have updated the test scripts to cope with the change in the API authentication method. Which of the following sequences of activities is BEST to ensure that the test scripts are not adversely affected by these changes?

A.

First upgrade the OS, then implement the change in the API authentication method, and finally run all the updated test scripts

B.

Implement one change at a time and run a subset of the updated test scripts after each change, and finally run all the updated test scripts

C.

First implement the change in the API authentication method, then upgrade the OS, and finally run all the updated test scripts

D.

Implement one change at a time and run a subset of the updated test scripts after each change

Question # 14

Which of the following success factors for a test automation project is TRUE?

A.

Automated tests must be designed to capture only the data that is strictly needed for comparing expected and actual results

B.

The test cases to be automated first must always be selected based on the number of times a test will need to be run

C.

The test cases to be automated must have a high dependency on particular data values

D.

Automated tests that fail due to changes in the requirements of the SUT should be promptly fixed rather than disabled from the test suite

Question # 15

A TAS that performs automated testing in a single test environment was successfully manually installed and configured from a central repository, with all its components in the correct versions. It was also verified that all TAS components in this environment are capable of providing reliable and repeatable performance. The TAS will be used to run several suites of automated regression test scripts on various SUTs in the test environment. Your current goal is to complete all preliminary verifications to ensure that the TAS works correctly. Which of the following activities would you perform FIRST?

A.

Create scripts to automatically install and configure the TAS in the test environment from the central repository

B.

Check whether the TAS connectivity to all required internal systems, external systems, and interfaces is available

C.

Run a given suite multiple times using TAS to determine whether all regression test scripts always provide the same result

D.

Check whether all regression test scripts in a given suite have expected results

Question # 16

The last few runs for a suite of automated keyword-driven tests on a SUT were never completed. The test where the run was aborted was not the same between runs. Currently, it is not possible to identify the root cause of these aborts, but only determine that test execution aborted when exceptions (e.g., NullPointerException, OutOfMemoryError) occurred on the SUT by analyzing its log files. Test execution log files are currently generated, in HTML format, by the TAS as follows: all expected logging data is logged for each keyword in intermediate log files. This data is then inserted into the final log file only for keywords that fail, while only a configurable subset of that data is logged for keywords that execute successfully. Which of the following actions (assuming it is possible to perform all of them) would you take FIRST to help find the root cause of the aborts?

A.

Log the stack trace and amount of memory available to the SUT at the start and end of each test in the suite, in the SUT log files

B.

Split the generated log file into smaller parts, load them into external files that are loaded into the browser in transparent mode when needed

C.

Log all expected logging data in the final test execution log file, not only for keywords that fail, but also for keywords that execute successfully

D.

Use appropriate colors to effectively visually highlight different types of information in the test execution log files

Question # 17

You have been tasked with adding the execution of build verification tests to the current CI/CD pipeline used in an Agile project. The goal of these tests is to verify the stability of daily builds and ensure that the most recent changes have not altered core functionality. Currently, the first activity performed as part of this pipeline is the static source code analysis. Which of the following stages in the pipeline would you add the execution of these smoke tests to?

A.

As a first activity, before performing static source code analysis and before generating the new build

B.

After performing static analysis on the source code and before generating the new build

C.

After deploying the new build to the test environment and before performing more extensive testing

D.

As a final activity, immediately before releasing the new build into production

Question # 18

Which of the following statements does NOT describe good practice for maintaining the TAS?

A.

The TAS must run in the development environment because development and programming knowledge are required for its maintainability

B.

The TAS must be under configuration management, along with the test suite, the testware artefacts and the test environment in which it runs

C.

The TAS must separate the test scripts from the environment in which it runs and from the associated harnesses and artefacts

D.

The TAS must consist of components that can be easily replaced without affecting the overall behavior of the TAS itself

Question # 19

You identified a suitable project to pilot an automation tool and planned and conduced a pilot. The pilot has been successful and tool Is being deployed within your organization, with a plan to increase tool use by the one project at a time. During this rollout some test processes will be changed slightly to gain additional benefits from using the tool.

In the pilot project, a small set of manual tests were automated for the first time. You are currently monitoring the test automation efficiency and this reveals that the automation regime for the tests is not yet mature.

Which of the following statements is TRUE?

A.

The approach used for deployed this tool is aligned to the standard success factor for deployment

B.

The pilot project should have been critical so that maximum benefits were delivered

C.

The target defined for the project was inappropriate, because the automation regime for the automated tests at the end of the pilot is not yet mature.

D.

The test process should be radically changed to gain additional benefits from using the tool.

Question # 20

You are using a gTAA to create a TAS for a project. The TAS is aimed specifically at automating a suit of existing manual test cases for standalone desktop applications. All the interfaces between the TAS and SUT will be from the CUI of the application.

Which of the following layers of the gTAA should you focus on for the TAS?

A.

The test Generation layer

B.

The Test Definition layer

C.

The Test Adaption layer

D.

The Test Execution layer