You'll find that our CTAL-TAE exam questions frequently feature detailed scenarios and practical problem-solving exercises that directly mirror industry challenges. Engaging with these CTAL-TAE sample sets allows you to effectively manage your time and pace yourself, giving you the ability to finish any ISTQB Certified Tester Advanced Level, Test Automation Engineering practice test comfortably within the allotted time.

Question # 21

A defect in a SUT has been resolved and validated by an automated defect re-test in the current release of the software. This retest has now been added to the automated regression test suite.

Which statement BEST describes a reason why this defect could re-occur in future releases?

A.

Automated defect confirmation testing is not effective at confirming that the resolved defect will continue to work in future releases

B.

The configuration management process does not properly control the synchronization between software archives

C.

The automated regression test suite is not run consistently for future releases.

D.

The automated regression test suite has a narrower scope of functionality

Question # 22

You have been asked to determine a TAS for a new release of a SUT, test should be automated wherever. The new release will consist of 5 new interfaces and an amendment to 3 existing interfaces. The new and amended interface will be deliver incrementally in 3 sprints, each lasting 2 weeks.

What would be the BEST Test Automation Solution (TAS) design in this scenario?

A.

Automate tests at both Component and System Level. Only do this automation once every interface has been fully developed or amended and manual testing has completed successfully.

B.

Automate tests at one level only, System level. Use only the newly developed interfaces and do not create any customized interfaces/test hooks.

C.

Automate the tests at two levels, Component and System level. Create customized hooks at Component level for interface not yet developed or amended. Only use the newly developed or amended interfaces to test at System level.

D.

Automate a test at once level, component level, Create customized interface/test hooks for this level where the interface has not yet been developed or amended.

Question # 23

You have been asked to automate a set of functional tests at system Test level via the CLI of the SUT for the first release of a software system. The automated tests will be delivered to the learn in change of maintenance testing, who will use them for part of the regression testing. They have the following requirements.

1. The automated tests must be as fast and cheap to maintain as possible

2. The cost of adding new automated tests must be as low as possible

3. The automated tests must have a high level of independence from the tool itself

Which of the following scripting techniques would be MOST suitable?

A.

Data-driven scripting

B.

Keyword-driven scripting

C.

Linear scripting

D.

Structure scripting

Question # 24

Which of the following is NOT a technical design consideration for a TAA?

A.

The number of users for the SUT

B.

Availability of interfaces for the SUT to be testable

C.

Standards and Legal requirements, e.g data privacy

D.

Data used by the SUT, e.g configuration, users