You'll find that our CTFL-AT exam questions frequently feature detailed scenarios and practical problem-solving exercises that directly mirror industry challenges. Engaging with these CTFL-AT sample sets allows you to effectively manage your time and pace yourself, giving you the ability to finish any Certified Tester Foundation Level Agile Tester practice test comfortably within the allotted time.

Question # 11

Which of the following is a typical task performed by a tester within a Scrum team?

A.

Suggesting improvements in sprint retrospectives

B.

Coaching other team members in self-organization and cross-functionality

C.

Removing impediments to the Scrum team’s progress

D.

Prioritizing the items in the product backlog

Question # 12

Which of the following statements best describes Agile software development?

A.

Agile software development is a software development approach whereby lines of code (production and/or test) of a component are written by two programmers sitting at a single computer

B.

Agile software development tends to break a project into a number of iterations, where each iteration represents a separate phase of sequential development and thus in which testing is performed during the last iteration

C.

Agile software development tends to adopt an iterative incremental lifecycle, where requirements and solutions evolve through collaboration between self-organizing and cross-functional teams

D.

Agile software development tends to break a project into a series of increments, each of which delivers a portion of functionality through a series of mini-Waterfalls where all phases of the Waterfall are completed before proceeding to the next increment

Question # 13

Which of the following statements describes Configuration Management?

A.

Configuration management is a test management task that deals with developing and applying a set of corrective actions to get a test project on track when monitoring shows a deviation from what was planned

B.

Configuration management represents a method for measuring and managing session-based testing, where a session is an uninterrupted period of testing which could last from 60 to 120 minutes

C.

Configuration management consists of all of the test design techniques in which test cases are designed to execute all possible discrete combinations of any set of a specified number of configuration elements

D.

Configuration management aims to identify and document some characteristics of a configuration item, control changes to those characteristics, and record and report change processing and implementation status

Question # 14

Which agile development approach incorporates the following practices:

* a project is divided into iterations called sprints

* each sprint results in a potentially releasable/shippable product?

A.

Kanban

B.

Extreme Programming

C.

Continuous Integration

D.

Scrum

Question # 15

You have been asked to explain to your client how to define acceptance criteria that are fully testable. Which of the following is the BEST EXAMPLE for testable acceptance criteria?

A.

The “ID” field must accept input value of a length between 2 and 10 characters.

B.

The interface to External System shall be specified.

C.

Action “Reopen” must be available only for a user with a specific authorization level.

D.

The program's icon should be clear and attractive.

Question # 16

Which of the following is an Agile software development approach in which transparency of content and progress of tasks is usually obtained with the visualization of the active tasks and in which iterations are optional?

A.

Scrum

B.

Continuous integration

C.

Kanban

D.

Slack

Question # 17

Which of the following activities are done in release planning?

1) Identifying testable user stories with acceptance criteria.

2) Elaborating the user stories into tasks.

3) Prioritizing the user stories.

4) Creating acceptance tests for the user stories.

5) Analyzing risks for each of the user stories.

6) Performing high level estimation for the release.

A.

Activities 1, 4 and 6

B.

Activities 2 and 4

C.

Activities 2, 3 and 5

D.

Activities 1, 3 and 6

Question # 18

A Scrum team is performing quality risk analysis during planning for the first iteration. User stories have associated risk items with levels determined by impact and likelihood. For multiple risk items, the user story’s risk is the average of individual risk levels.

Which of the following statements would you expect most likely to be true?

A.

While the identification of the risk items should be performed by the Product Owner, the assessment of the risk levels should be performed by the whole team

B.

Potential issues with poorly written user stories should not be raised during risk analysis because they could influence how the risk level is determined

C.

Regardless of the risk level, more thorough test techniques should be selected for US-004 since it is the user story with most associated risk items

D.

An estimation session after the risk analysis should consider only the risk level for effort estimation

Question # 19

User Story: As a user I want to be able to calculate tax percentage based on amount of income.

What is the best black box test design technique for verifying the accuracy of this user story?

A.

Statement testing - test all statements in income calculation.

B.

User story testing - test that the user can enter an income amount and get a result.

C.

State transition testing - test all states of income entry.

D.

Equivalence partitioning - test with low, medium and high income.

Question # 20

Which ONE of the following is an example of a typical “Business-oriented work product”?

A.

The released product.

B.

Acceptance testing entry criteria.

C.

A user manual.

D.

Usability testing test results.