Which parameters can be defined when sizing a Dell Unity XT solution using the Simple Performance method?
A customer has three Dell PowerStore 1000Ts in a cluster and wants to add a PowerStore 5000X. What must they do?
Which two workload parameters are required to proceed with sizing for a PowerStore solution? (Select 2)
Which two parameters avoid bottlenecks and improve performance when sizing Dell Unity XT storage solutions? (Select 2)
What result is obtained by multiplying the VM count by the Capacity per VM in a PowerStore system?
A PowerStore solution must support hosts using 100 Gb/s Eth connectivity and hosts using 16 Gb/s FC connectivity. How should the I/O Modules be populated according to Dell Best Practices?
What is the maximum supported drive configuration in the base enclosure of the PowerStore 3200T?
Which two attributes characterize I/O workloads for sizing the PowerStore storage solution? (Select 2)
What information must a solution architect gather before they start designing a storage solution?
A company has a Dell Unity XT 880 at its Boston site providing file storage for a business production application. The company has a second remote site 8 km (5 mi) away in Cambridge. A third site is in New York (342 km (213 mi) from the Boston site). How can the same production data be protected against system outage with a zero RPO and a maximum of 15 minutes RPO data recovery?
What is the maximum throughput per port in backend 12 GB SAS ports in Dell Unity XT arrays?
Which Dell Unity XT DPE front-end port connectivity can support up to 30,000 IOPS/port and up to 1,700 MB/s?
An application owner needs 10 volumes for their application to be created, and they must have snapshots taken simultaneously with write-order-consistency. Which feature in Dell PowerStore should be used to enable this requirement?
The CPU utilization in a Dell Unity XT system is currently at 68%. What is the level of CPU utilization?
What benefit do higher capacity drives provide in a Dell Unity All Flash array?
What is done during the preconfigure step of a PowerStore block import migration?
What is recommended maximum cable length for PowerStore back-end NVMe cabling to avoid performance issues?