Last Update 1 hour ago Total Questions : 70
The HPE Network Data Center Professional Architect Exam content is now fully updated, with all current exam questions added 1 hour ago. Deciding to include HPE7-A12 practice exam questions in your study plan goes far beyond basic test preparation.
You'll find that our HPE7-A12 exam questions frequently feature detailed scenarios and practical problem-solving exercises that directly mirror industry challenges. Engaging with these HPE7-A12 sample sets allows you to effectively manage your time and pace yourself, giving you the ability to finish any HPE Network Data Center Professional Architect Exam practice test comfortably within the allotted time.
You are designing an L3 spine-and-leaf topology using CX switches. The switches implement EVPN VXLAN with a distributed gateway model. You are helping implementers compile a list of required loopback interface IDs and IP blocks.
What information is needed from the customer to complete this list?
You have delivered a CX 10000-based data-center network to a customer. The customer wants to ensure a smooth transition to the new network before beginning to implement the security capabilities.
What should you recommend for the initial deployment?
You are implementing a spine-and-leaf architecture using 18 CX 8360-48Y6C v2 leaf switches and two CX 8325-32C spine switches. The leaf switches support servers with 10- and 25-GbE ports. You currently plan to use two 100-Gbps uplinks per leaf switch.
The customer now requires at least a 50% increase in uplink bandwidth per leaf switch. What is a valid modification to the plan?
Which details should you seek to identify during the initial data-center network design meetings with the customer? Choose two.
When you create an endpoint group in Aruba Fabric Composer, which option should you choose in the Endpoints section to protect the hypervisor?
Waratah Hospital, located in Australia, plans to relocate many data-center services to a new facility. (The remaining legacy data center is not included in this project.) Waratah Hospital has engaged an external consultant to help design the new data-center network.
Based on the data-center network-infrastructure requirements, the external consultant has produced a high-level design. The design document is summarized below.
Requirements and information:
Six racks in the data-center room (a single row).
Redundant top-of-rack leaf switches with back-to-front cooling in every rack, delivering 10/25-Gbps connectivity to servers, storage, and other devices.
Four 100-GbE uplinks per leaf switch.
The customer requested that all switch ports face the rear of the rack racks (hot aisle).
OOB management for servers, storage, and network devices must be provided through an external switch with back-to-front cooling. This switch must be included in the solution. One OOB switch provides connectivity for two racks.
Core equipment for the OOBM network is being reused.
Middle-of-row spine switches.
The data center must connect to the hospital building through links providing 400 Gbps.
Internet access is supplied through an existing firewall cluster containing two firewalls, with one firewall in each data room. The second firewall operates in standby mode, and VRRP is used for firewall failover. The data-center network must connect to these firewalls through links totaling 100 Gbps.
The external link is a dark-fiber direct link using single-mode fiber (OS2). The distance to the main hospital is 1.5 KM. The links will terminate on two core switches in the hospital.
The customer additionally requires:
99.999% uptime for this life-critical environment.
Planned and unplanned downtime must be minimized.
Software upgrades are permitted only once per year, with close to zero downtime.
All life-critical resources are accessed locally, and all resources reside within the hospital campus.
Waratah Hospital requires a highly secure data-center environment. Encrypted wire-speed connectivity between the data room and hospital is mandatory because the inter-building link crosses a public road.
Waratah Hospital has a mixture of virtualized (vSphere) servers, Nutanix storage, bare-metal servers, backup servers, and other devices.
Previously, the hospital experienced a security breach that caused data loss, network downtime, and identity theft.
Refer to the scenario. You have learned that the customer must extend two VRFs between the new data-center facility and the hospital. To meet the scenario requirements and general best practices, what should you recommend to connect border leaf switches to the hospital core?
In a multi-fabric design, what is the minimum recommended MTU?
Waratah Hospital, located in Australia, plans to relocate many data-center services to a new facility. (The remaining legacy data center is outside this project’s scope.) Waratah Hospital has engaged an external consultant to help design the new data-center network.
Based on the data-center network-infrastructure requirements, the external consultant has produced a high-level design. The design document is summarized below.
Requirements and information:
Six racks in the data-center room (a single row).
Redundant top-of-rack leaf switches with back-to-front cooling in every rack, delivering 10/25 Gbps connectivity to servers, storage, and other devices.
Four 100 GbE uplinks per leaf switch.
The customer requested that all switch ports face the rear of the racks (the hot aisle).
OOB management for servers, storage, and network devices must be delivered through an external switch with back-to-front cooling. This switch must be included in the solution. One OOB switch provides connectivity for two racks.
Core equipment for the OOBM network is being reused.
Middle-of-row spine switches.
The data center must connect to the hospital building through links providing 400 Gbps.
Internet access is supplied through an existing firewall cluster with two firewalls, one in each data room. The second firewall operates in standby mode, and VRRP is used for firewall failover. The data-center network must connect to these firewalls with links totaling 100 Gbps.
The external link is a single-mode-fiber (OS2) dark-fiber direct link. The distance to the main hospital is 1.5 KM. The links will terminate on two core switches in the hospital.
The customer also requires:
99.999% uptime for this life-critical environment.
Planned and unplanned downtime must be minimized.
Software upgrades are permitted only once per year, with close to zero downtime.
All life-critical resources are accessed locally, and all resources are within the hospital campus.
Waratah Hospital requires a highly secure data-center environment. Encrypted wire-speed connectivity between the data room and the hospital is mandatory because the link between the buildings crosses a public road.
Waratah Hospital has a mix of virtualized (vSphere) servers, Nutanix storage, bare-metal servers, backup servers, and other devices.
Previously, the hospital experienced a security breach that caused data loss, network downtime, and identity theft.
Refer to the scenario. You are deciding between the CX 9300 and CX 8325 switches for the border leaf switches. Which hard customer requirement affects this decision?
You are designing a pair of CX switches to function as ToR switches. The switches use VSX in a data-center Layer 2 topology and connect to the core through VSX LAGs. To satisfy expansion requirements, you must keep as many ports available as possible.
Which option should you recommend for VSX keepalives?
A customer has deployed CX 10000 switches, Fabric Composer, and Pensando Policy and Services Manager (PSM). The switches are discovered in PSM, but no VRFs or networks have been added. The customer now wants to begin by applying micro-segmentation to one network. They state that they plan to add a policy containing rules that permit desired traffic from endpoints in this network. They will apply it to the network as an egress policy. At this time, they will not add any other networks to PSM or apply policies to them.
What warning should you raise to the customer about this plan?