You'll find that our LEED-AP-ID+C exam questions frequently feature detailed scenarios and practical problem-solving exercises that directly mirror industry challenges. Engaging with these LEED-AP-ID+C sample sets allows you to effectively manage your time and pace yourself, giving you the ability to finish any LEED AP Interior Design + Construction (LEED AP ID+C) V4 practice test comfortably within the allotted time.

Question # 11

A project needs 5,000 ft2 (464.5 m2) of raised flooring. The tenant wants to refurbish and install an existing raised floor from another building as part of the project. If this material will equate to 14% of the overall project materials cost, which credit would this contribute towards?

A.

Innovation Credit, Option 1. Innovation

B.

Materials and Resources Credit, Construction and Demolition Waste Management

C.

Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of Raw Materials, Option 2. Leadership Extraction Practices

D.

Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of Raw Materials, Option 1. Raw Material Sourcing and Extraction Disclosure

Question # 12

A single tenant occupies an entire building but wishes to renovate and achieve LEED certification on only a portion of the building. This is possible if

A.

the project boundary includes 75% of the construction scope and is drawn at a clear, physical barrier

B.

the project boundary includes 100% of the construction scope and is drawn at a clear, physical barrier

C.

the project boundary excludes no more than 40% of the construction scope and is drawn at a clear, physical barrier

D.

the project boundary excludes no more than 60% of the construction scope and is drawn at a clear, physical barrier

Question # 13

To satisfy the Increased Ventilation strategy in the Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies, the breathing zone rates of outdoor air ventilation to all occupied spaces must be increased above the minimum rates required in ASHRAE 62.1-2010 by at least what percentage?

A.

10%

B.

20%

C.

30%

D.

50%

Question # 14

Which standard reference can be used to find minimum ventilation rates?

A.

ASHRAE 55-2010

B.

ASHRAE 90.1-2010

C.

SCAQMD Rule 1168

D.

ASHRAE 62.1-2010

Question # 15

A project incorporates steel beams as an interior architectural feature, but no recycled content information is available. When calculating the recycled content of the beams, which default content amount should be used?

A.

10%

B.

15%

C.

20%

D.

25%

Question # 16

The project team for a bank project located in a mall is wondering whether they can earn Location and Transportation Credit Surrounding Density and Diverse Uses, Option 2. Diverse Uses. When evaluating a map of nearby diverse uses, which of the following would you recommend to be entered in the calculation?

A.

Health club, Laundromat, Post office, Restaurant

B.

Hair salon, Movie Theater, Pharmacy, Restaurant

C.

Clothing store, Commercial office, Eye doctor, Supermarket

D.

Convenience store, Furniture store, Hardware store, Pharmacy

Question # 17

A client has moved into a building that has photovoltaic panels installed on the roof. Which credit applies?

A.

Indoor Environmental Quality Credit, Daylight

B.

Energy and Atmosphere Credit, Renewable Energy Production

C.

Energy and Atmosphere Credit, Green Power and Carbon Offsets

D.

Materials and Resources Credit, Interiors life-cycle impact reduction

Question # 18

To determine the area of interior nonstructural elements, the LEED AP will include which one of the following in the calculation for Materials and Resources Credit, Interiors Life Cycle Impact Reduction, Option 1. Interior Reuse?

A.

Up to three layers of a floor assembly

B.

Items that are demolished and not replaced

C.

The interior side of exterior windows and doors

D.

Hazardous materials that are remediated as part of the project

Question # 19

Which strategy could be incorporated into the negotiations of a lease agreement between a tenant and building owner

to contribute towards earning a LEED credit?

A.

A lease renewal option prior to 10 years

B.

Discounted parking fees for first year of lease

C.

An energy payment plan where the tenant pays a flat rate on utilities through the building owner

D.

Energy purchase through the building owner's campus facility that produces renewable power to Green-e standards

Question # 20

Source reduction appears at the top of the Environmental Protection Agency's (EPA's) hierarchy because it

A.

reduces environmental impacts by reusing existing materials

B.

reduces environmental impacts associated with material containing high levels of toxic chemicals

C.

reduces environmental impacts throughout the material's life cycle by specifying recycled content in the material selected

D.

reduces environmental impacts throughout the material's life cycle, from the supply chain and use to recycling and waste disposal