Spring Sale Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: buysanta

Exact2Pass Menu

LEED AP Neighborhood Development (LEED ND)

Last Update 12 hours ago Total Questions : 100

The LEED AP Neighborhood Development (LEED ND) content is now fully updated, with all current exam questions added 12 hours ago. Deciding to include LEED-AP-ND practice exam questions in your study plan goes far beyond basic test preparation.

You'll find that our LEED-AP-ND exam questions frequently feature detailed scenarios and practical problem-solving exercises that directly mirror industry challenges. Engaging with these LEED-AP-ND sample sets allows you to effectively manage your time and pace yourself, giving you the ability to finish any LEED AP Neighborhood Development (LEED ND) practice test comfortably within the allotted time.

Question # 11

Which of the following approaches contributes to achieving a point under Neighborhood Pattern and Design Credit. Community Outreach and Involvement?

A.

Conduct a telephone survey of users of similar projects in the same region

B.

Present the project and solicit community Input at an open house during construction

C.

Conduct a one day design charrette or interactive workshop with the design team and client

D.

Create and maintain an interactive website for discussion between the developer and the community throughout the duration of the project

Question # 12

A project team has determined that achieving Green Infrastructure and Buildings Credit. Solar Orientation is feasible Based on a preliminary assessment of site features, sunlight and shading, the maximum solar access has been determined. What is the next step the project needs to take to incorporate optimum solar orientation into the site design?

A.

Determine whether each building can be designed within 15 degrees of geographical east-west

B.

Review local and federal tax incentives and incorporate the monetary value of incentives into the protect budget and site design

C.

Determine the total building square footage in the project and identify all buildings where one axis is at least 2.5 times longer than the others

D.

Study building envelopes and daylighting opportunities for planned development and adjust construction documents to reflect optimum solar orientation

Question # 13

A mixed-use project without transit service has the following characteristics:

* 55 townhomes on 9 acres (3.6 hectares) of buildable land

* 44.000 ft2 (4.088 m2) of commercial building on 87.120 ft2(9.094.m2) Of buildable land

What should be added to the development plan to meet the minimum density requirements for Neighborhood Pattern and Design Prerequisite Compact Development?

A.

Four dwelling units

B.

Eight dwelling units

C.

12.220 ft2(1.135 m2) of commercial space

D.

130.000 ft2 (12 077 m2) of commercial space

Question # 14

For credits requiring bicycle storage as well as shower and changing facilities, shower requirements may be met in office buildings by providing

A.

private locker storage within the restrooms.

B.

one shower and changing room per 200 employees.

C.

free access to a health club shower within the building

D.

reduced cost memberships to a health club within the same building.

Question # 15

Winch of the following fixtures, fillings, or appliances Is outside the scope of water use reduction calculations in Green in Infrastructure and Buildings Credit. Indoor Water Use Reduction?

A.

Residential shower head

B.

Commercial dishwashers

C.

Residential and commercial toilets

D.

Kitchen sink foucels

Question # 16

A project team is planning to achieve the maximum points in the Regional Priority category. The LEED AP should

A.

use any credit that seems appropriate tor the location of the project.

B.

refer to USGBCs website to determine which credits are eligible as the Regional Priority credits for the project's location.

C.

review similar protects to see which Regional Priority credits were achieved.

D.

choose the appropriate Regional Priority credits based on personal experience

Question # 17

What information is required to determine if a project quality for the Green Infrastructure and Buildings Credit. Wastewater Management?

A.

Rainwater reuse rate

B.

Cost of installing wastewater system

C.

Average amount of annual wastewater generated

D.

Ability to connect to existing wastewater infrastructure

Question # 18

Which of the following are eligible sources of renewable energy under Green Infrastructure and Buildings Credit. Renewable Energy Production?

A.

Passive solar heating strategies offsetting heating energy use

B.

Cogeneration of electricity and heat using mill residue biomass

C.

Geothermal energy used in conjunction with a ground-source Moat pump

D.

Photovoltaic energy generation purchased from an off-site location

Question # 19

A project Is planning a new bus service and shelters to service a new community. Which of the following would be required to meet the Neighborhood Pattern and Design Credit. Transit Facilities?

A.

Provide points of connectivity of 140 street intersections per square mile

B.

Provide a park and ride parking, lot within 150 ft. (46 m) of the transit shelter

C.

Display transit schedules and route information at each public transit stop

D.

Transit agency confirmation that additional weather protected transit shelters will be provided within five years of protect completion.

Question # 20

What Is the existing or granted right to use property for specific types and quantities of land uses?

A.

Entitlement

B.

Building Permit

C.

Development Agreement

D.

Certificate of Occupancy

Go to page: