You'll find that our LEED-AP-ND exam questions frequently feature detailed scenarios and practical problem-solving exercises that directly mirror industry challenges. Engaging with these LEED-AP-ND sample sets allows you to effectively manage your time and pace yourself, giving you the ability to finish any LEED AP Neighborhood Development (LEED ND) practice test comfortably within the allotted time.

Question # 21

Which of the following strategies is a best practice for reducing a project's development footprint?

A.

increase the amount of impervious area on-site

B.

Provide parking under or within a building structure

C.

Increase the number of cul-de-sacs throughout the site

D.

Implement a construction erosion and sedimentation control plan

Question # 22

Which of the following can be included within the boundary of a project site on an urban waterfront?

A.

Dock to be constructed by the developer

B.

House boats in place prior to the issuance of certificate of occupancy

C.

Marina pier in place prior to the date of property acquisition

D.

Jetty with funding for construction prior to the date of certification

Question # 23

According to Green Infrastructure and Buildings Prerequisite. Indoor Waler Use Reduction, the indoor water usage of a new building or buildings undergoing major renovations (nonresidential buildings, mixed-use buildings, and multifamily tour stones or more), must average at least

A.

10% less than in baseline buildings.

B.

20% less than in baseline buildings.

C.

30% loss than in baseline buildings

D.

50% less than in baseline buildings.

Question # 24

A project team has achieved the require men is for Neighborhood Pattern and Design Credit. Community Outreach and Involvement. Option 1: Community Outreach. Which of the following additional actions would earn the project a total or two points?

A.

Conduct an Interactive workshop open to the public for at least two days

B.

Modify Die projects conceptual design as a direct result of community input

C.

Establish ongoing moans for communication between the developer and the community

D.

Obtain full entitlement and endorsements from the local land use and Building permitting jurisdictions

Question # 25

For Neighborhood Pattern and Design Tree-Lined and Shaded Streetscapes Credit - Option 2 Shaded Sidewalks.what size of newly planted trees can be considered in calculating the percentage or shaded sidewalks?

A.

Crown diameter at time of purchase

B.

Crown diameter at time of planting

C.

Crown din motor five years after planling

D.

Crown diameter 10 years after planting

Question # 26

On a project with 10 residential units, which of the following would contribute to achieving Neighborhood Pattern and Design Credit. Neighborhood Schools?

A.

Including a new middle school with a 12-acre (4.8 hectare) campus

B.

Including a new elementary school with a four-acre (1.6 hectare) campus

C.

Locating all of the units within a 1.5 mi (2414m) walking distance of an ousting high school

D.

Locating three units within a 1/2 mi. (800 m) walking distance, and seven units within a one ml. (1.600 m) walking distance of an existing elementary school

Question # 27

A LEED for Neighborhood Development project is going to temporarily reroute existing transit service outside the required distances as pan or the construction process. The protect team has secured an agreement with the transit agency to restore the rerouted service. What is the maximum number of years the service can be rerouted in order to quality tor Smart Location and Linkage Credit. Access to Quality Transit?

A.

One year

B.

Two years

C.

Three years

D.

Four years

Question # 28

An undeveloped five acres (two hectare) site has a two-acre (0.8 hectare) area sloping al 50%. To achieve Smart Location and Linkage Credit. Steep Slope Protection, what possible percentage of the site could be developed?

A.

50%

B.

65%

C.

75%

D.

90%

Question # 29

What is the development footprint?

A)

B)

C)

D)

A.

Option A

B.

Option B

C.

Option C

D.

Option D

Question # 30

The LEED for Neighborhood Development project team needs to prepare a flood map as an exhibit tor an upcoming zoning commissioning meeting. Which of the following government agencies provides this data?

A.

U.S. Environmental Protection Agency (EPA) or local equivalent for protects outside of the U.S

B.

Federal Emergency Management Agency (FEMA) or local equivalent for projects outside of the U.S.

C.

Department of Housing and Urban Development (HUD) or local equivalent for projects outside of the US

D.

U.S. Department of the Interior (DOI) or local equivalent for projects outside of the U.S.