You'll find that our D-SNC-DY-00 exam questions frequently feature detailed scenarios and practical problem-solving exercises that directly mirror industry challenges. Engaging with these D-SNC-DY-00 sample sets allows you to effectively manage your time and pace yourself, giving you the ability to finish any Dell SONiC Deploy Exam practice test comfortably within the allotted time.

Question # 4

Create port channel 10 on interfaces Eth 1/11 and 1/12, so that it connects to an already configured switch. A server will be connected on Eth 1/1. Both the server and port channel need VLAN 1 untagged and only VLAN 10 tagged.

Complete the configuration on Switch A.

Question # 5

Configure the system to meet these requirements.

. Configure R1 with AS 1.

. R1 must use a static neighbor assignment for BGP peering.

. R1 needs to redistribute all current and future connected IPv4 routes.

All the required BGP configurations have already been completed on R2.

R2 resides in BGP AS 2.

Question # 6

VLAN 40 is configured in Switch A with an anycast-address of 192.168.40.254/24. The ARP neighbor suppression is enabled. Use the simulator to create a VTEP named vtep1 and assign an IP address of

10.10.10.1. Map the VNI 400 to VLAN 40.

Question # 7

Which network devices route unencapsulated user traffic in a symmetric IRB overlay network?

A.

Source VTEP and destination VTEP

B.

Leaf router and spine router

C.

Capability extended next hop router and leaf router

D.

Autonomous system boundary router and source VTEP