Summer Sale Special 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: ex2p65

Exact2Pass Menu

LEED AP Neighborhood Development (LEED ND)

Last Update 19 hours ago Total Questions : 100

The LEED AP Neighborhood Development (LEED ND) content is now fully updated, with all current exam questions added 19 hours ago. Deciding to include LEED-AP-ND practice exam questions in your study plan goes far beyond basic test preparation.

You'll find that our LEED-AP-ND exam questions frequently feature detailed scenarios and practical problem-solving exercises that directly mirror industry challenges. Engaging with these LEED-AP-ND sample sets allows you to effectively manage your time and pace yourself, giving you the ability to finish any LEED AP Neighborhood Development (LEED ND) practice test comfortably within the allotted time.

Question # 4

A non-Infill site has prime agricultural soils in areas of the site where construction is planned. Which would contribute to meeting the Smart Location and Linkage Prerequisite. Agricultural Land Conservation?

A.

Transfer the project's development rights to another location

B.

Fund and organize a community supported agriculture (CSA) program

C.

Remove the prime agricultural sails and piano them on existing farmland

D.

Purchase off-site comparable soil easements to mitigate the loss of affected soils

Question # 5

A project teamchooses to install highly efficient street lights and traffic lights throughout a 21-acre neighborhood project. Which credit could this efficiency help the team earn?

A.

Light Pollution Reduction

B.

Renewable Energy Production

C.

infrastructure Energy Efficiency

D.

Optimize Building Energy Performance

Question # 6

A project team has achieved the require men is for Neighborhood Pattern and Design Credit. Community Outreach and Involvement. Option 1: Community Outreach. Which of the following additional actions would earn the project a total or two points?

A.

Conduct an Interactive workshop open to the public for at least two days

B.

Modify Die projects conceptual design as a direct result of community input

C.

Establish ongoing moans for communication between the developer and the community

D.

Obtain full entitlement and endorsements from the local land use and Building permitting jurisdictions

Question # 7

A developer is trying to calculate it a property qualities as an adjacent site. When considering the bordering land alongthe property boundary, which ofthe following borders can be omitted from the calculation?

A.

A border along a lake

B.

A wetland bordering the site

C.

A public street or other right-of-way

D.

A bordering site that Is previously disturbed

Question # 8

Which of the following la an eligible source of renewable energy tot Green Infrastructure and Buildings Credit. Renewable Energy Production?

A.

Wind energy

B.

Ground-source Heat pump

C.

Combust on of municipal solid waste

D.

Forest biomass waste other than mill residue

Question # 9

An Erosion and Sedimentation Control Plan Is required to achieve Green infrastructure and Buildings Prerequisite Construction Activity Pollution Prevention.Which of the following Is an objective of this prerequisite?

A.

increasing stormwater flow rates off a site

B.

Providing a long term strategy for flood control

C.

Preventing air pollution with dust and particulate matter

D.

Reducing greenhouse gas emissions associated with the project

Question # 10

A developer has 100 acres (40 declares) of undeveloped forest The vision of the community is to preserve over 60% of the land as undeveloped Which of the following can help the project to quality for the Smart Location and Linkage Prerequisite. Smart Location?

A.

The project contains no criticalhabitats

B.

The project is along a planned transit condor for the county

C.

The project is planned for a density at 10 dwelling units (DU) per acre (25 DU/hectare)

D.

The project is in a receiving area for a Transfer of Development Rights program

Go to page: