Spring Sale Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: buysanta

Exact2Pass Menu

Nutanix Certified Systems Engineer (NCSE): Level 1

Last Update 13 hours ago Total Questions : 83

The Nutanix Certified Systems Engineer (NCSE): Level 1 content is now fully updated, with all current exam questions added 13 hours ago. Deciding to include NCSE-Level-1 practice exam questions in your study plan goes far beyond basic test preparation.

You'll find that our NCSE-Level-1 exam questions frequently feature detailed scenarios and practical problem-solving exercises that directly mirror industry challenges. Engaging with these NCSE-Level-1 sample sets allows you to effectively manage your time and pace yourself, giving you the ability to finish any Nutanix Certified Systems Engineer (NCSE): Level 1 practice test comfortably within the allotted time.

Question # 21

A prospect is planning to refresh hundreds of remote locations. Each location has the following configuration:

• 2x HPE DL360 servers running vSphere, each using its own local storage

• 3-4 Windows VMs with no plans to expand

Scheduling the initial meeting to discuss the opportunity has been challenging as the prospect believes a Nutanix solution would be overpriced for their remote site needs.

What are two Nutanix capabilities the SE should highlight to address solution cost concerns? (Choose two.)

A.

1 -Node and 2-Node Clusters

B.

Xi DRaaS

C.

Foundation

D.

AHV

Question # 22

A prospect provides the following details for sizing active working set based on their existing server virtualization environment:

Full backup reports:

January: 10TB

February: 11TB

March: 12TB

April: 13TB

May: 14TB

Average Read/Write Ratio - 75/25

When entering a Raw Input in Sizer, what should the SE use as the minimum amount of required SSD Storage?

A.

1.5TB

B.

3TB

C.

4.5TB

D.

6TB

Question # 23

An SE is working to size a prospects environment that includes production Oracle databases.

Which Oracle output should the SE request from the prospect to collect accurate sizing information?

A.

STATSPACK

B.

Active Session History Report

C.

Oracle Export Schema

D.

Automatic Workload Repository Report

Question # 24

A customer plans to migrate a business critical,highly tranactional SQL Server database to Nutanix Currently the databases is running on a physical server with 256GB of RAM and 12CPU cores at > 80% utilization To run the VM on a single NUMA node, which processor configuration should the SE recommend for this workload?

A.

Intel E5 2680v4 (14 cores each @ 2.4GHZ, 28 Cores total)

B.

Intel E5 2620v4 ( 8 cores each @ 2.1GHZ, 16 Cores total)

C.

Intel E5 2643v4 ( 6 cores each @ 3.4GHZ, 12 Cores total)

D.

Intel E5 2667v4 ( 8 cores each @ 3.2GHZ, 16 Cores total)

Go to page: