Spring Sale Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: buysanta

Exact2Pass Menu

SAP Certified Application Associate - SAP S/4HANA Cloud public edition - Manufacturing

Last Update 2 hours ago Total Questions : 159

The SAP Certified Application Associate - SAP S/4HANA Cloud public edition - Manufacturing content is now fully updated, with all current exam questions added 2 hours ago. Deciding to include C_S4CMA_2308 practice exam questions in your study plan goes far beyond basic test preparation.

You'll find that our C_S4CMA_2308 exam questions frequently feature detailed scenarios and practical problem-solving exercises that directly mirror industry challenges. Engaging with these C_S4CMA_2308 sample sets allows you to effectively manage your time and pace yourself, giving you the ability to finish any SAP Certified Application Associate - SAP S/4HANA Cloud public edition - Manufacturing practice test comfortably within the allotted time.

Question # 41

Which tool do you use to develop your own cloud applications for SAP S/4HANA Cloud?

A.

SAPUI5 SDK

B.

SAP Cloud SDK

C.

SAP ADK

D.

SAP HANA Studio

Question # 42

What defines the organizational entities that are required in SAP Central Business

Configuration?

Note: There are 2 correct answers to this question.

A.

System consistency checks

B.

The selected scope

C.

The selected deployment target

D.

Added partner content

Question # 43

Which overview cards are available in the Quality Technician Overview app? (2 correct)

A.

Inspection lots with open results for inspection points

B.

Inspection lots without inspection plan

C.

Inspection lots without usage decision

D.

Top defective materials

Question # 44

How are capacities considered in planning in the Perform Production Capacity Planning and Evaluation (31L) scope item?

A.

Material Requirements Planning (MPR) delivers capacity requirements. Overloads are identified and ^ worked on subsequently. Conversion to production orders is part of the process.

B.

Material Requirements Planning (MPR) delivers capacity requirements. Overloads are identified by ^ capacity evaluation. In case of bottleneck overloads the MRP is started again.

C.

Material Requirements Planning (MPR) delivers capacity requirements that are leveled simultaneously with available capacity. Remaining overloads are indicated by overload alerts.

D.

Material Requirements Planning (MPR) does NOT deliver capacity requirements. These are created in a separate step in capacity planning. Leveling is done only afeter conversion.

Question # 45

Which new option is available in the Manage Material Coverage app as of SAP S/4HANA Cloud 2005?

A.

Display pegging network

B.

Maintain business priority

C.

Change vendor assignment

D.

Undo previous step

E.

Create order

Question # 46

When can you add relationships in the Organizational Structure? (2 correct)

A.

Before initial content activation

B.

After one entity has been created

C.

During content activation

D.

After content activation

Question # 47

For which of the following activities is the starter system used?

A.

Run integration testing.

B.

Set up the Test Automation Tool.

C.

Transport the solution configuration to the quality system.

D.

Document delta requirements in the backlog.