Question # 4

In which cases are projects (PS) used in the area of SAP S/4HANAAsset Management? Note: There are 2 correct answers to this question.

A.

Condition-based maintenance

B.

Investments

C.

Shutdowns and overhaul

D.

External refurbishment

Full Access
Question # 5

Which operations are possible when you cancel the technical completion of a maintenance order? Note: There are 2 correct answers to this question.

A.

Change the priority.

B.

Cancel status Released.

C.

Book a goods receipt.

D.

Change the estimated costs.

Full Access
Question # 6

The planner adds non-stock material in a released maintenance order. Which of the following statements regarding the purchasing process are correct? Note: There are 3 correct answers to this question.

A.

The maintenance order can be set to TECO before the invoice is created.

B.

A purchase order is created automatically as soon as the order is saved.

C.

A purchase requisition can be created automatically as soon asthe the order is saved.

D.

A goods receipt can be posted after the maintenance order is technically completed

E.

A goods receipt can ONLY be posted for a maintenance order with status REL.

Full Access
Question # 7

Which of the following can you assign to an equipment category via a view profile? Note: There are 2 correct answers to this question.

A.

Configuration

B.

Manufacturer data

C.

Serial data

D.

Warranty

Full Access
Question # 8

You want to set up a general maintenance task list for inspectionrounds using the overall time confirmation as a simplified way torecord measurement documents. What do you need to do? Note: There are 2 correct answers to this question.

A.

Assign a piece of equipment with an allocated measuring point to a task list operation.

B.

Assign an inspection lot to the task list header.

C.

Assign a measuring point as a production resources/tools(PRT) to a task list operation.

D.

Assign an inspection document as PRT to the task list operation.

Full Access
Question # 9

The technical completion of the current maintenance order was posted with a delay of 5 days. What happens to the next planneddate if you set the shift factor for early completion to 100%?

A.

It is not shifted.

B.

It is postponed by 5 days.

C.

It is postponed by a full cycle (100%).

D.

It will be 5 days earlier.

Full Access
Question # 10

Where can you see the results of the material availability check for maintenance orders? Note: There are 2 correct answers to this question.

A.

In the single-level list editing function for maintenance orders

B.

In the report Material: Where-Used List

C.

Within a maintenance order

D.

In the material reservation list in inventory management

Full Access
Question # 11

What happens if you change the primary key of a functionallocation?

A.

The functional location is immediately assigned to a new superior functional location when the new label is entered.

B.

The user must define a new labelling system for the new primary key.

C.

Changing the superior functional location via alternative labeling is not possible.

D.

The user must decide whether the functional location is assigned to a new superior functional location.

Full Access
Question # 12

Which objects can you use in the safety measure list? Note: Thereare 2 correct answers to this question.

A.

Work approval

B.

Permits

C.

Documents

D.

Work clearance documents

Full Access
Question # 13

Which of the following statements about SAP Asset Manager aretrue? Note: There are 3 correct answers to this question.

A.

SAP Asset Manager can run on smart watches.

B.

SAP Asset Manager is available for Windows platform.

C.

SAP Asset Manager can be used offline.

D.

SAP Asset Manager can be used offline.

E.

SAP Asset Manager is available for SAP S/4HANA and SAPERP.

Full Access