Spring Sale Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: buysanta

Exact2Pass Menu

Certified Technology Specialist

Last Update 4 hours ago Total Questions : 254

The Certified Technology Specialist content is now fully updated, with all current exam questions added 4 hours ago. Deciding to include CTS practice exam questions in your study plan goes far beyond basic test preparation.

You'll find that our CTS exam questions frequently feature detailed scenarios and practical problem-solving exercises that directly mirror industry challenges. Engaging with these CTS sample sets allows you to effectively manage your time and pace yourself, giving you the ability to finish any Certified Technology Specialist practice test comfortably within the allotted time.

Question # 61

This image shows the workings of which type of microphone?

A.

ribbon

B.

dynamic

Question # 62

In sound, amplitude is perceived as

A.

pitch

B.

tone

C.

loudness

D.

frequency

Question # 63

A cardioid subwoofer array uses delay, equalization, and

A.

gating.

B.

polarity.

C.

phase shift.

D.

compression.

Question # 64

When connecting a condenser microphone, what MUST be included in die system design for it to operate?

A.

mixer

B.

stand

C.

transmitter

D.

power source

Question # 65

The color of a light wave is determined by the

A.

ambient temperature.

B.

polarization.

C.

frequency.

D.

amplitude.

Question # 66

" Shock Loads " for equipment mounts refer to

A.

suspended equipment not electrically isolated from Its mounting structure.

B.

sudden additional loads from earthquakes or personnel hanging from the mounts.

C.

calculated counterweight required to balance an offset load on a cantilever mount.

D.

calculated isolation required to eliminate vibration otherwise transferred to the building structure.

Question # 67

Which kind of drawing should a technician refer to in order to determine how to hang a loudspeaker line array?

A.

detail

B.

section

C.

elevation

D.

reflected ceiling plan

Question # 68

Upon completion of hardware installation and configuration for a new deployment, the NEXT thing the AV Project Manager should have scheduled is

A.

training the client.

B.

testing and verification.

C.

invoicing and project close out.

D.

preventative maintenance schedule.

Question # 69

In the initial stage of determining AV equipment for an installation, the AV team gathers information PRIMARILY to:

A.

Understand the application

B.

Prepare a punch (snag or defect) list

C.

Establish a baseline for system performance

D.

Produce schematic drawings of the proposed solution

Question # 70

The MAIN benefit of an inventory tracking system in an AV rental and staging business is having an accurate record of

A.

customers contact details.

B.

current resale value of assets.

C.

current state and commitments of assets.

D.

customer’s budgets and spending history.

Go to page: