You'll find that our D-AV-DY-23 exam questions frequently feature detailed scenarios and practical problem-solving exercises that directly mirror industry challenges. Engaging with these D-AV-DY-23 sample sets allows you to effectively manage your time and pace yourself, giving you the ability to finish any Dell Avamar Deploy 2023 Exam practice test comfortably within the allotted time.

Question # 11

Starting at the bottom, what is the recommended order for racking components in a Gen4 Dell Avamar Data Store rack without premium support?

A.

Utility, spare, storage, switches

B.

Switches, utility, storage, spare

C.

Switch A, utility, spare, storage, Switch B

D.

Switch A, spare, storage, utility, Switch B

Question # 12

What is the maximum number of nodes that can be configured for an Dell Avamar multi-node grid?

A.

15 storage, 1 utility, 1 NDMP, and 1 spare

B.

16 storage, 1 utility, and 1 spare

C.

17 storage and 1 utility

D.

17 storage, 1 utility, and 1 spare

Question # 13

An Dell Project Manager asks you to provide a deliverable that documents all details of an Dell Avamar server implementation. Which deliverable is used?

A.

TS-Kit Configuration Guide

B.

TS-Kit Test Plan

C.

SVC Qualifier

D.

Statement of Work

Question # 14

Prior to starting an Dell Avamar node add and rebalance procedure, what should be done first to ensure that the activity can be completed without data loss?

A.

Perform a full system pre-upgrade health check

B.

Perform an orderly reboot of all nodes in the grid

C.

Run ' asktime ' to ensure all node clocks are synchronized

D.

Add the new node names and IPs to the /etc/hosts file

Question # 15

What is the physical memory requirement for an Dell AVE with 1 TB capacity?

A.

6 GB

B.

8 GB

C.

16 GB

D.

32 GB

Question # 16

You are performing an ad-hoc backup from a Microsoft Windows client. Which log file would you use to investigate communication issues between the Avamar client and the Avamar server utility node?

A.

avagent.log

B.

COD-workorder-Windows.log

C.

MOD-workorder-Windows.log

D.

err.log

Question # 17

What does an HFS check do?

A.

Validates the integrity of a checkpoint

B.

Performs server checkpoint rollbacks

C.

Performs a snapshot of an Avamar server

D.

Checks for RAID controller errors

Question # 18

Which role is used to perform and monitor restores?

A.

Activity Operator

B.

Backup/Restore User

C.

Restore Only Operator

D.

Restore Only User

Question # 19

The Dell Avamar client needs to backup a file and has performed sticky-byte factoring. This results in the following:

    Seven (7) chunks that will compress at 30%

    Four (4) that will compress at 23%

    Two (2) chunks at 50% compression

How many chunks will be compressed prior to hashing?

A.

4

B.

7

C.

9

D.

13

Question # 20

At which percentage of user capacity will Dell Avamar issue the first warning?

A.

70

B.

80

C.

85

D.

65