Innovation in Procurement and Supply

Last Update 1 hour ago Total Questions : 120

The Innovation in Procurement and Supply content is now fully updated, with all current exam questions added 1 hour ago. Deciding to include L6M8 practice exam questions in your study plan goes far beyond basic test preparation.

You'll find that our L6M8 exam questions frequently feature detailed scenarios and practical problem-solving exercises that directly mirror industry challenges. Engaging with these L6M8 sample sets allows you to effectively manage your time and pace yourself, giving you the ability to finish any Innovation in Procurement and Supply practice test comfortably within the allotted time.

Question # 11

The Plan-Do-Check-Act cycle provides a Framework for an organisation to follow under which ISO standard?

A.

ISO 14001

B.

ISO 14040

C.

ISO 20400

D.

ISO 27000

Question # 12

TGY Ltd is a manufacturing organisation which produces five major components for use in the transport sector. Each component is produced by a different Project Team. Below are details of the five projects.

Project 1: The team are looking at where the material originates and how much of this natural resource is left in the ground.

Project 2: The team are focused on what happens when the product is no longer required by the customer and whether the product can be repurposed to save it going to landfill.

Project 3: The team are keen to ensure the customer is happy with the product and that it meets safety standards. The focus of the Life Cycle Analysis is on what happens inside the factory.

Project 4: The team are looking at the longevity of the item once purchased by the customer.

Project 5: The team are exploring the additional overhead costs associated with the production of the item and the way in which the item is produced.

Complete the table below by listing the area of life cycle analysis being looked at, and the area of the Balanced Scorecard this relates to (some options may be used twice); energy consumption, use, disassembly, extraction, manufacturing, transportation, sustainability x2, quality, environment, value for money, processes.

Which of the following will you put into box 3?

A.

energy consumption

B.

use

C.

disassembly

D.

extraction

E.

manufacturing

F.

transportation

Question # 13

Below are details of five companies who all have different types of relationships with their suppliers. For each company, select the corresponding relationship type and the main relationship- influencing KPI monitored by the company.

Company 1: The relationship is characterised by high levels of conflict, but is one in which there is mutual respect for each other’s ideas and innovative solutions are often formed from the conflict. This KPI is measured by the level of information sharing between the buyer and supplier and the level of reliability of both parties.

Company 2: There is a low level of co-operation between Company 2 and its main supplier. The contract is not expected to last much longer due to conflicts that cannot be resolved amicably. There is a low level of dependency on the supplier and a number of alternative providers in the marketplace.

Company 3: The relationship is characterised by a win-win approach and both parties consider themselves equal. The relationship is measured based on its openness, honesty and levels of information sharing, particularly in the disclosure of sensitive information.

Company 4: Company 4 works well with their supplier and there is little conflict. The relationship is important due to the high value of the contract and the two parties work together to meet the same goals. The KPI measures the exchanges and levels of collaboration between the parties.

Company 5: The supplier does not place much importance on the relationship with Company 5 due to the low value of the contract. Company 5 is worried that the supplier is not willing to invest in the contract and therefore are measuring the loyalty of the supplier as a KPI.

Complete the table below with the correct relationship type and relationship influencing KPI: nice, creative, marginal, hostile, partnership arm’s length, power, trust, co-operation, communication, commitment, transparency.

Which of the following will you put into box 4?

A.

nice

B.

creative

C.

marginal

D.

hostile

E.

partnership

F.

arm ' s-length

Question # 14

Below are details of 5 companies who are all embarking on the launch of a new product. For each company, you must decide which innovation tactic they are using and the priority for the new contract.

Company 1: The company aims to design the specification around customers’ requirements. They are keen to ensure a balance between costs and the service provided.

Company 2: This company attends regular conferences held by a professional body and will use the information discussed to inform upon the specification. They are keen to ensure sufficient interest from the marketplace so are placing a priority on networking at the conferences.

Company 3: There is a small group of internal stakeholders who meet regularly at Company 3 who discuss supply chain and organisational integration. The priority for the group is to ensure that the supplier of the new product’s raw materials meets the company’s standards for environmental protection.

Company 4: This company has regular phone calls with suppliers discussing ideas for the new product. Once the product is launched, the focus will be on ensuring that the supplier is held to account.

Company 5: Equipment has been loaned to a supplier to produce a prototype of the new product. The aim of the project is to ensure the supplier is capable of producing the components required for the product before the contract is signed.

Complete the table below by listing the innovation tactic and contract priority for each company; focus group, innovation council, technology transfer, collaboration, supplier forum, early supplier involvement, supplier development, balanced scorecard, contract management, selection, value for money, bidding.

Which of the following will you put into box 4?

A.

focus group

B.

innovation council

C.

technology transfer

D.

collaboration

E.

supplier forum

F.

early supplier involvement

Question # 15

Julie is the CEO of a small manufacturing company which is struggling to compete in the marketplace. Julie is considering implementing Simultaneous Engineering processes, what would be the benefit of this to her organisation? Select all that apply

A.

reduction in development time

B.

fewer design changes

C.

less staff are required

D.

increased sales

Question # 16

Samir runs a small furniture manufacturing organisation and has recently decided to implement a Just-in-Time methodology. He has weighed up the pros and cons of this and has concluded it is the right thing for his business. Samir acknowledges that certain aspects of procurement will therefore need to change. Which of the following would Samir need to be aware of?

A.

he cannot change supplier

B.

he cannot make an error in the quantities ordered

C.

he must increase storage capacity for deliveries

D.

he must ensure fixed delivery dates with suppliers

Question # 17

Below are details of 5 companies who are all embarking on the launch of a new product. For each company, you must decide which innovation tactic they are using and the priority for the new contract.

Company 1: The company aims to design the specification around customers’ requirements. They are keen to ensure a balance between costs and the service provided.

Company 2: This company attends regular conferences held by a professional body and will use the information discussed to inform upon the specification. They are keen to ensure sufficient interest from the marketplace so are placing a priority on networking at the conferences.

Company 3: There is a small group of internal stakeholders who meet regularly at Company 3 who discuss supply chain and organisational integration. The priority for the group is to ensure that the supplier of the new product’s raw materials meets the company’s standards for environmental protection.

Company 4: This company has regular phone calls with suppliers discussing ideas for the new product. Once the product is launched, the focus will be on ensuring that the supplier is held to account.

Company 5: Equipment has been loaned to a supplier to produce a prototype of the new product. The aim of the project is to ensure the supplier is capable of producing the components required for the product before the contract is signed.

Complete the table below by listing the innovation tactic and contract priority for each company; focus group, innovation council, technology transfer, collaboration, supplier forum, early supplier involvement, supplier development, balanced scorecard, contract management, selection, value for money, bidding.

Which of the following will you put into box 2?

A.

focus group

B.

innovation council

C.

technology transfer

D.

collaboration

E.

supplier forum

F.

early supplier involvement

Question # 18

Below are details of five companies who all have different types of relationships with their suppliers. For each company, select the corresponding relationship type and the main relationship- influencing KPI monitored by the company.

Company 1: The relationship is characterised by high levels of conflict, but is one in which there is mutual respect for each other’s ideas and innovative solutions are often formed from the conflict. This KPI is measured by the level of information sharing between the buyer and supplier and the level of reliability of both parties.

Company 2: There is a low level of co-operation between Company 2 and its main supplier. The contract is not expected to last much longer due to conflicts that cannot be resolved amicably. There is a low level of dependency on the supplier and a number of alternative providers in the marketplace.

Company 3: The relationship is characterised by a win-win approach and both parties consider themselves equal. The relationship is measured based on its openness, honesty and levels of information sharing, particularly in the disclosure of sensitive information.

Company 4: Company 4 works well with their supplier and there is little conflict. The relationship is important due to the high value of the contract and the two parties work together to meet the same goals. The KPI measures the exchanges and levels of collaboration between the parties.

Company 5: The supplier does not place much importance on the relationship with Company 5 due to the low value of the contract. Company 5 is worried that the supplier is not willing to invest in the contract and therefore are measuring the loyalty of the supplier as a KPI.

Complete the table below with the correct relationship type and relationship influencing KPI: nice, creative, marginal, hostile, partnership arm’s length, power, trust, co-operation, communication, commitment, transparency.

Which of the following will you put into box 10?

A.

power

B.

trust

C.

co-operation

D.

communication

E.

commitment

F.

transparency

Question # 19

Mohammed has recently been hired as the new CEO of ABC Ltd, a large manufacturing organisation. The organisation has struggled in recent years due to the highly competitive nature of the marketplace and Mohammed has been brought in to radically change the organisation’s approach to procurement and supply chain management.

Traditionally the organisation has dictated its requirements to suppliers with stringent penalty clauses for non-compliance. Mohammed is keen to change this approach and leverage the knowledge of suppliers to ABC’s advantage.

XYZ is the main supplier to ABC Ltd and Mohammed has set up a meeting to discuss the relationship and contract currently in place. He wishes the relationship to be win-win and wishes to share ideas on potential efficiencies that can be gained for both organisations. He will propose a new mechanism for monitoring the performance of the contract based on four key parameters; cost, customer satisfaction, innovation and operational processes.

XYZ provides raw materials such as iron and steel and Mohammed is keen to gain an understanding of the environmental impact of the extraction, transportation and usage of these materials, the findings of which will impact the company’s mission statement, which will be re-written next year.

In terms of other suppliers, where spend is minimal and risk is low, Mohammed plans to introduce Standard Operating Procedures for the procurement of supplies and is looking into various tools which will save the procurement team time and money.

Which of the following tools would be most useful to the procurement team?

A.

P2P system

B.

simultaneous engineering

C.

technology transfer

D.

ERP system

Question # 20

Below are details of five companies who all have different types of relationships with their suppliers. For each company, select the corresponding relationship type and the main relationship- influencing KPI monitored by the company.

Company 1: The relationship is characterised by high levels of conflict, but is one in which there is mutual respect for each other’s ideas and innovative solutions are often formed from the conflict. This KPI is measured by the level of information sharing between the buyer and supplier and the level of reliability of both parties.

Company 2: There is a low level of co-operation between Company 2 and its main supplier. The contract is not expected to last much longer due to conflicts that cannot be resolved amicably. There is a low level of dependency on the supplier and a number of alternative providers in the marketplace.

Company 3: The relationship is characterised by a win-win approach and both parties consider themselves equal. The relationship is measured based on its openness, honesty and levels of information sharing, particularly in the disclosure of sensitive information.

Company 4: Company 4 works well with their supplier and there is little conflict. The relationship is important due to the high value of the contract and the two parties work together to meet the same goals. The KPI measures the exchanges and levels of collaboration between the parties.

Company 5: The supplier does not place much importance on the relationship with Company 5 due to the low value of the contract. Company 5 is worried that the supplier is not willing to invest in the contract and therefore are measuring the loyalty of the supplier as a KPI.

Complete the table below with the correct relationship type and relationship influencing KPI: nice, creative, marginal, hostile, partnership arm’s length, power, trust, co-operation, communication, commitment, transparency.

Which of the following will you put into box 8?

A.

power

B.

trust

C.

co-operation

D.

communication

E.

commitment

F.

transparency