You'll find that our LEED-AP-O+M exam questions frequently feature detailed scenarios and practical problem-solving exercises that directly mirror industry challenges. Engaging with these LEED-AP-O+M sample sets allows you to effectively manage your time and pace yourself, giving you the ability to finish any LEED AP Operations + Maintenance (LEED AP O+M) practice test comfortably within the allotted time.

Question # 21

An ASHRAE Level 1 walkthrough analysis contributes to what prerequisite or credit?

A.

Energy and Atmosphere Prerequisite, Building-Level Energy Metering

B.

Energy and Atmosphere Credit, Enhanced Refrigerant Management

C.

Energy and Atmosphere Prerequisite, Minimum Energy Performance

D.

Energy and Atmosphere Prerequisite, Energy Efficiency Best Management Practices

Question # 22

The project team has been directed by the building owner to only pursue practices that directly improve the actual building performance. Which of the following would be the lowest cost option?

A.

Install a new high-efficiency chiller

B.

Purchase renewable energy credits

C.

Install new high efficiency urinal flush valves

D.

Provide financial support for off-site conservation

Question # 23

Which materials or products are covered in Materials and Resources Prerequisite, Facility Maintenance and Renovations Policy?

A.

Refrigerators

B.

Replacement carpet tiles

C.

Janitorial paper purchases

D.

Automated scrubbing machines

Question # 24

Which of the following prerequisites or credits have synergies with Materials and Resources Prerequisite, Facility Maintenance and Renovation Policy?

A.

Sustainable Sites Credit, Site Management

B.

Materials and Resources Credit, Purchasing - Lamps

C.

Energy and Atmosphere Prerequisite, Fundamental Refrigerant Management

D.

Indoor Environmental Quality Credit, Indoor Air Quality Management Program

Question # 25

Using the following table, the number of cooling tower cycles in Water Efficiency Credit, Cooling Tower Water Use is determined by which five parameters in the rating system? (Click on Exhibit)

A.

All of the five parameters summed together

B.

All of the five parameters subtracted from the maximum concentration level

C.

Whichever of the five parameters has the fewest calculated cycles of concentration without exceeding the maximum level for the parameter

D.

Whichever of the five parameters has the greatest calculated cycles of concentration without exceeding the maximum level for the parameter

Question # 26

A project team has ended all their performance periods between August 1st and August 31st. When is the latest date that the project team can submit for preliminary review?

A.

September 30th

B.

October 30th

C.

November 30th

D.

December 30th

Question # 27

What is the maximum number of points possible for the Exemplary Performance option of the Innovation Credit, Innovation?

Calculator

A.

1 point

B.

2 points

C.

3 points

D.

4 points

Question # 28

Which of the following is an allowable method to increase cooling tower cycles of concentration?

A.

Reduce confing tower run-hours

B.

Increase quantities of potable makeup water

C.

Increase treatment levels of potable makeup water

D.

Decrease intervals between cooling tower water testing

Question # 29

To determine possible credit compliance for Energy and Atmosphere Credit, Advanced Energy Metering, what information needs to be verified?

A.

That the meter data is remotely accessible

B.

That the meter is capable of storing data for at least 12 months

C.

That the meter(s) can be manually read

D.

That the meter(s) record data at a minimum of 15 minute intervals

Question # 30

In following the Sheet Metal and Air Conditioning National Contractors Association (SMACNA) Indoor Air Quality (IAQ) Guidelines for Occupied Buildings under Construction, what is the Minimum Efficiency Reporting Value (MERV)

as determined by ASHRAE 52.2-2007 required for renovation activities?

A.

7

B.

8

C.

12

D.

13