You'll find that our LEED-AP-O+M exam questions frequently feature detailed scenarios and practical problem-solving exercises that directly mirror industry challenges. Engaging with these LEED-AP-O+M sample sets allows you to effectively manage your time and pace yourself, giving you the ability to finish any LEED AP Operations + Maintenance (LEED AP O+M) practice test comfortably within the allotted time.

Question # 41

An organization pursuing LEED O+M certification for their headquarters has a renovation policy that includes strict requirements around the selection of building products and requires contractors working in the building to develop a plan for the diversion of waste produced during renovation projects. What must the organization add to their renovation policy to meet the requirements of Materials and Resources Prerequisite, Facility Maintenance and

Renovation Policy?

A.

Requirements around the selection of low-emitting materials for renovation projects

B.

Requirements for contractors to safeguard air quality during renovation

C.

Requirements for the salvage and reuse of furniture within the building

D.

Requirements for contractors to perform construction activity pollution prevention

Question # 42

What is the diversion percentage of ongoing consumables in order to achieve exemplary performance as specified in Materials and Resources Credit, Solid Waste Management - Ongoing?

A.

50%

B.

75%

C.

85%

D.

90%

Question # 43

Key functional and operational parameters such as occupied hours of a building, use by space type, required temperature settings, and lighting levels, are specified in the

A.

Basis of Design

B.

Design Narrative

C.

Owner Project Requirements

D.

Current Facility Requirements

Question # 44

What must the project team do regardless of building type for Energy and Atmosphere Prerequisite, Minimum Energy Performance?

A.

Compile meter data into daily and weekly summaries

B.

Use Labs21 Energy Benchmarking tool to calculate minimum energy performance

C.

Establish an ENERGY STAR® Portfolio Manager profile

D.

Benchmark building site energy data of at least three similar buildings

Question # 45

In order for a project team to meet the requirements of Indoor Environmental Quality Credit, Integrated Pest Management, how much advanced notice to building occupants is needed after the emergency application of a pesticide other than the least toxic pesticide?

A.

12 hours

B.

24 hours

C.

48 hours

D.

72 hours

Question # 46

Which of the following is an environmentally friendly technology for controlling erosion?

A.

Mulching

B.

Laying asphalt

C.

Laying tarpaulin material

D.

Spraying water to contain dust

Question # 47

How many months of metered energy use after occupancy are required to earn Energy and Atmosphere Prerequisite, Minimum Energy Performance?

A.

Three months

B.

Five months

C.

12 months

D.

13 months

Question # 48

Presuming all water fixtures meet the LEED Operations and Maintenance Rating System requirements, which of

the following statements is correct when considering baseline water usage in relation to water use?

A.

For a building with a certificate of occupancy dated 1993 or later, the baseline water usage is 120% of the water use

B.

For a building with a certificate of occupancy dated 1995 or later, the baseline water usage is 120% of the water use

C.

For a building with a certificate of occupancy dated 1993 or later, the baseline water usage is 150% of the water use

D.

For a building with a certificate of occupancy dated 1995 or later, the baseline water usage is 150% of the water use

Question # 49

A LEED AP performs several on-site reviews for LEED compliance and encounters the following scenarios. Which scenario requires the installation of additional meters to comply with Energy and Atmosphere Prerequisite, Building-Level Energy Metering?

A.

A school whose electricity usage is being measured and invoiced by the local electrical utility

B.

A building plus its addition whose electricity and natural gas usage is being measured by the original building's meters

C.

A data center that receives electricity from a campus plant and whose meters are located at the electrical service entrances

D.

A building that shares its chilled water usage with other buildings on a campus and whose chilled water consumption is measured at the campus level