Last Update 19 hours ago Total Questions : 105
The Execution and Control of Operations content is now fully updated, with all current exam questions added 19 hours ago. Deciding to include CPIM-ECO practice exam questions in your study plan goes far beyond basic test preparation.
You'll find that our CPIM-ECO exam questions frequently feature detailed scenarios and practical problem-solving exercises that directly mirror industry challenges. Engaging with these CPIM-ECO sample sets allows you to effectively manage your time and pace yourself, giving you the ability to finish any Execution and Control of Operations practice test comfortably within the allotted time.
Which of the following project characteristics would suggest using the PERT technique, rather than the critical path method?
A supplier of roller bearings makes lots of 10,000 and sorts them automatically according to size. In a typical lot of 10,000, the sizes break into the following categories:
{exhibit 1213}
The product requires rollers on target or, at most, 0.0001 oversize. Experience indicates that 100% must be reinspected before use because the machine inspection lets a few defective units slip through. The supplier should be encouraged to take which of the following actions?
Control charts are used to do which of the following?
When a company moves from sampling inspection to internal process control, which of the following actions should be taken prior to evaluating supplier performance?
What is a role of a manager using a Kaizen circle for problem solving?
Standard costing systems may encourage production managers to do which of the following activities?
In process improvement, which of the following procedures should be done first?