You'll find that our CPIM-ECO exam questions frequently feature detailed scenarios and practical problem-solving exercises that directly mirror industry challenges. Engaging with these CPIM-ECO sample sets allows you to effectively manage your time and pace yourself, giving you the ability to finish any Execution and Control of Operations practice test comfortably within the allotted time.

Question # 11

What is a goal of Hoshin planning?

A.

Target the critical few problems and assign resources to remove barriers for improvement

B.

Focus on the operational plan to remove routine issues that reduce product quality

C.

Solve as many problems as possible by using lean management principals and techniques

D.

Focus on the details of the process in order to better understand what capabilities are required

Question # 12

With vendor managed inventory, a supplier must obtain which of the following data from the customer to ensure high service levels?

A.

Average quantity per shipment

B.

Average inventory level

C.

Inventory consumption

D.

On-time delivery percentage

Question # 13

The following problems were reported from the field:

{exhibit 4967}

Which of the following techniques could be used to solve these problems?

A.

Tighten present tolerances

B.

Analyze process control data

C.

Establish supplier certification

D.

Increase the inspection rate

Question # 14

Which of the following components are associated with inventory functions?

A.

Transit, cycle, and warehousing

B.

Transit, cycle, and safety stock

C.

Safety stock, anticipation, and work in process (WIP)

D.

Raw, work in process (WIP), and finished goods

Question # 15

Which of the following characteristics are found in a good quality management system?

A.

It covers a broad range of activities.

B.

It emphasizes sampling inspection.

C.

It relies on qualitative measurements.

D.

It reduces variability in the workplace.

Question # 16

Which of the following steps should be first in determining operation start dates for capacity planning?

A.

Input/output control

B.

Forward or backward scheduling

C.

Finite or infinite loading

D.

Order preparation and release

Question # 17

The question below is based on the following information:

{exhibit 1528}

What is the available capacity in hours for a 20-workday month?

A.

160

B.

180

C.

240

D.

320

Question # 18

Scheduling to less-than-full capacity facilitates which of the following outcomes?

A.

Material handling reduction

B.

Increased finished goods

C.

Preventative maintenance

D.

Reduced forecast variance

Question # 19

The primary reason for using an empty conveyance container as a triggering signal is to:

A.

communicate the need for material.

B.

keep the original container filled with material.

C.

pull material downstream.

D.

push material downstream.

Question # 20

A plant that implements a total preventive maintenance program would be likely to:

A.

acquire the latest in computer-controlled production equipment.

B.

use statistical process control to identify equipment problems.

C.

involve production workers directly in maintaining and managing production equipment.

D.

identify and remove the causes of abnormal instrumentation and tooling variation.