Last Update 3 hours ago Total Questions : 272
The ISTQB Certified Tester Foundation Level content is now fully updated, with all current exam questions added 3 hours ago. Deciding to include CTFL-Foundation practice exam questions in your study plan goes far beyond basic test preparation.
You'll find that our CTFL-Foundation exam questions frequently feature detailed scenarios and practical problem-solving exercises that directly mirror industry challenges. Engaging with these CTFL-Foundation sample sets allows you to effectively manage your time and pace yourself, giving you the ability to finish any ISTQB Certified Tester Foundation Level practice test comfortably within the allotted time.
Which of the following processes ensures that all items of testware are identified, version controlled, tracked for changes, so that traceability can be maintained throughout the test process?
Which of the following are valid test objectives?
(i) Finding defects.
(ii) Gaining confidence about the level of quality and providing information.
(iii) Preventing defects.
(iv) Debugging the code.
What are metrics NOT used for?
Which of the following statements about software development models is most accurate? [K1]
Which of the following does NOT represent one of the three triggers for maintenance testing an operational system?
Which of the following would NOT be a common metric used for monitoring test preparation and execution?
When considering the roles of test leader and tester, which of the following tasks would NOT typically be performed by a tester?
Your task is to compile a test execution schedule for the current release of software.
The system specification states the following logical dependencies:
• An admin user must create/amend/delete a standard user.
• A standard user is necessary to perform all other actions.
The test plan requires that re-tests must be performed first, followed by the highest priority tests. To save time, the test plan states that tests should be scheduled to create test data for the subsequent tests in the schedule.
The following test cases have been designed, with an indication of priority (1 being the highest priority) and whether the test has previously failed.

Which test execution schedule meets the test plan requirements and logical dependencies?
When can functional and structural testing BOTH be applied?

The decision table above shows a company's fuel expenses structure.
Which of the following Test Cases based on the decision table are Valid?
Test Case 1:
An employee who is not a car or motorcycle driver attempts to claim fuel expenses. Expected result: Expense claim not allowed.
Test Case 2:
An employee who drives a 1700cc diesel car attempts to claim fuel expenses. Expected result: Expense claim accepted at band C.
Test Case 3:
An employee who rides a motorcycle attempts to claim fuel expenses. Expected result: Expense claim accepted at band A.
