Summer Sale Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: buysanta

Exact2Pass Menu

ISTQB Certified Tester Foundation Level CTFL 4.0 Exam

Last Update 11 hours ago Total Questions : 188

The ISTQB Certified Tester Foundation Level CTFL 4.0 Exam content is now fully updated, with all current exam questions added 11 hours ago. Deciding to include CTFL4 practice exam questions in your study plan goes far beyond basic test preparation.

You'll find that our CTFL4 exam questions frequently feature detailed scenarios and practical problem-solving exercises that directly mirror industry challenges. Engaging with these CTFL4 sample sets allows you to effectively manage your time and pace yourself, giving you the ability to finish any ISTQB Certified Tester Foundation Level CTFL 4.0 Exam practice test comfortably within the allotted time.

Question # 11

Which of the following statements refers to a good testing practice that applies to all software development lifecycles?

A.

Each test level should have its own specific test objectives that should be consistent with the software development lifecycle phase or type of activities it addresses.

B.

Test analysis and design for any test levels should begin as soon as coding is complete, and all system components are available for testing

C.

The most efficient and effective method of conveying information to and within a development team is face-to-face conversation.

D.

All the tests should be automated and run as part of the continuous integration process with every software change

Question # 12

Which of the following statements about the test pyramid is TRUE?

A.

Each layer of the test pyramid groups tests related to a single non-functional quality charactenstic.

B.

The higher the layer of the test pyramid, the more production code a single automated test within the layer tends to cover

C.

The higher the layer of the test pyramid, the more maintainable a single automated test within the layer tends to be

D.

The higher the layer of the test pyramid, the more isolated a single automated test within the layer tends to be.

Question # 13

Which one of the following is a typical entry criteria for testing?

A.

Planned tests have been executed.

B.

Availability of testable requirements.

C.

The number of unresolved defects is within an agreed limit.

D.

The number of estimated remaining defects is sufficiently low.

Question # 14

Which ONE of the following statements about maintenance testing is CORRECT?

A.

Maintenance testing is performed exclusively for adaptive maintenance.

B.

Maintenance testing is only required when defects are reported in production.

C.

Maintenance testing should be performed when enhancements, fixes, or updates are applied to an existing system.

D.

Maintenance testing does not require test cases since it focuses solely on defect verification.

Question # 15

A virtual service emulating a real third-party service and the automated test scripts (aimed at testing the system under test) that interact with that service, are test work products that are typically created during:

A.

Test monitoring and control

B.

Test implementation

C.

Test design

D.

Test analysis

Question # 16

Which of the following statements about static testing and dynamic testing is true?

A.

Unlike dynamic testing, which can be also performed manually, static testing cannot be performed without specialized tools

B.

Static testing is usually much less cost-effective than dynamic testing

C.

Unlike dynamic testing, which focuses on detecting potential defects, static testing focuses on detecting failures which may be due to actual defects

D.

Both static testing and dynamic testing can be used to highlight issues associated with non-functional characteristics

Question # 17

Which of the following types of tools is BEST suited for determining source code compliance with the guidelines provided by a coding standard?

A.

Containerisation tool

B.

Fault seeding tool.

C.

Static analysis tool.

D.

Test data preparation tool

Question # 18

Which of the following statements about checklist-based testing is TRUE?

A.

Checklist-based testing is a technique for managing the review meeting that can be applied in those reviews where the use of checklists is mandatory, as is often the case in formal reviews.

B.

Checklist-based testing is a review technique that can be used in a formal review process where reviewers, during individual review, try to detect issues within the work product based on a checklist

C.

In checklist-based testing, using checklists at a high level of detail is more likely to produce test cases that are easier to reproduce than those using checklists at a low level of detail

D.

Checklists used in checklist-based testing should be reviewed periodically for updates as, over time, test cases designed using the same checklist may become less effective at finding defects.

Question # 19

Which of the following statements about the typical activities of a formal review process is TRUE?

A.

Individual review is only mandatory when the size of the work product under review is too large to cover at the review meeting

B.

Various review techniques that may be applied by participants during individual review are described in the ISO/IEC/IEEE 29119-3 standard.

C.

Choosing which standards to follow during the review process is usually made during review planning.

D.

One of the main goals of the review meeting is to make sure that all participants are aware of their roles and responsibilities in the review process

Question # 20

The tests at the bottom layer of the test pyramid:

A.

run faster than the tests at the top layer of the pyramid

B.

cover larger pieces of functionalities than the tests at the top layer of the pyramid

C.

are defined as 'Ul Tests' or 'End-To-End tests' in the different models of the pyramid

D.

are unscripted tests produced by experience-based test techniques

Go to page: