Summer Sale Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: buysanta

Exact2Pass Menu

ISTQB Certified Tester Foundation Level (Syllabus 2018)

Last Update 13 hours ago Total Questions : 365

The ISTQB Certified Tester Foundation Level (Syllabus 2018) content is now fully updated, with all current exam questions added 13 hours ago. Deciding to include CTFL_Syll2018 practice exam questions in your study plan goes far beyond basic test preparation.

You'll find that our CTFL_Syll2018 exam questions frequently feature detailed scenarios and practical problem-solving exercises that directly mirror industry challenges. Engaging with these CTFL_Syll2018 sample sets allows you to effectively manage your time and pace yourself, giving you the ability to finish any ISTQB Certified Tester Foundation Level (Syllabus 2018) practice test comfortably within the allotted time.

Question # 91

Which of the test cases below will exercise both outcomes from decision 2? [K3]

Refer to the exhibit

A.

P = 24, Q = 20, P=24, Q=25

B.

P = 36, Q = 36, P=37, Q=35

C.

P = 42, Q = 43, P=42, Q=42

D.

P = 37, Q = 36, P=35, Q=36

Question # 92

Which from the following list are typically found to enable the review process to be successful? [K2]

a. Each review has clear defined objectives

b. The lower the number of defects, the better the review process

c. The right people for the review objective are involved

d. There is an emphasis on learning and process improvement

e. Management are not involved in the process at all

f. Checklists should not be used, as these slow down the process

g. Defects found are welcomed and expressed objectively

A.

a, f and g.

B.

b, c and f.

C.

a, c and d.

D.

d, e and g.

Question # 93

Which of the following test design techniques is not a black box technique?

A.

Equivalence partitioning

B.

State transition testing

C.

Boundary value analysis

D.

Statement coverage

Question # 94

Which TWO of the following test tools would be classified as test execution tools? [K2]

a. Test data preparation tools

b. Test harness

c. Review tools

d. Test comparators

e. Configuration management tools

A.

a and b

B.

c and d

C.

c and e

D.

b and d

Question # 95

What other details should be included in the following incident report when it is first submitted?

Date of Issue: 23/11/05

Severity: P1

Build: Version15.6

Details: Expected field to be limited to 15 chars, able to enter 27

A.

Suggested solution, priority and number of defects assigned to this developer.

B.

Status of the incident, degree of impact, Test Case Number.

C.

History, related defects and expected fix time.

D.

Line of code, number of defects found, time of day.

Question # 96

A bank is developing a new service that will be delivered via the web. The user interactions are defined as a set of use cases and the service is designed to be available continuously 24/7. In view of the challenging characteristics of the service the test manager has decided that the code should be thoroughly tested at component level.

Which of the following test types will be required during the development? [K2]

A.

Functional testing to test security at the system level, load testing at the system level to ensure the system availability is acceptable, regression testing at all levels, structure based testing at the component level only

B.

Functional testing to test the use cases at component level, reliability testing to test availability at the integration level, regression testing at the system testing level only, structure based testing at all levels

C.

Functional testing of the use cases at system level, load testing at component level to ensure availability is acceptable, regression testing at the system and acceptance levels only, and structure based testing at the integration level only

D.

Functional testing to test security at the acceptance level, load testing at the acceptance test level to ensure availability is acceptable, regression testing at the acceptance level only to ensure late changes are made correctly, and structure based testing at the component level

Question # 97

Which of the main activities of the fundamental test process does the task ‘verify the test environment set up is correct’ relate to? [K1]

A.

Planning and control

B.

Analysis and design

C.

Implementation and execution

D.

Evaluating exit criteria and reporting

Question # 98

What content would be in an incident report if that incident report was based on the IEEE 829 Standard for SoftwareTest Documentation?

(i) Identification of configuration items of the software or system.

(ii) Software or system lifecycle process in which the incident was observed.

(iii) Description of the anomaly to enable reproduction of the incident.

(iv) Number of occurrences of the incident.

(v) Classification of the cause of the incident for metrics and for reporting purposes.

Number of correct answers: 1

A.

i, ii, iii

B.

ii, iii

C.

i, iii, iv

D.

i, ii, iii, v

Question # 99

Which of the following test design techniques is classified as a structure-based (white box) technique? [K1]

A.

Exploratory testing

B.

Decision table testing

C.

State transition testing

D.

Statement testing

Question # 100

Which of the following accurately defines the integration testing test level? [K2]

A.

Test basis includes software and system design, test objects include interfaces, and tests concentrate on the interactions between different parts of a system

B.

Test basis includes component requirements, test objects include database modules, and tests concentrate on the behaviour of the system as a whole.

C.

Test basis includes business processes, test objects include system configuration and configuration data, and tests concentrate on establishing confidence in the system

D.

Test basis includes use cases, test objects include user procedures and tests concentrate on a high level model of system behaviour

Go to page: