Summer Sale Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: buysanta

Exact2Pass Menu

ISTQB Certified Tester Foundation Level (Syllabus 2018)

Last Update 13 hours ago Total Questions : 365

The ISTQB Certified Tester Foundation Level (Syllabus 2018) content is now fully updated, with all current exam questions added 13 hours ago. Deciding to include CTFL_Syll2018 practice exam questions in your study plan goes far beyond basic test preparation.

You'll find that our CTFL_Syll2018 exam questions frequently feature detailed scenarios and practical problem-solving exercises that directly mirror industry challenges. Engaging with these CTFL_Syll2018 sample sets allows you to effectively manage your time and pace yourself, giving you the ability to finish any ISTQB Certified Tester Foundation Level (Syllabus 2018) practice test comfortably within the allotted time.

Question # 11

The ISTQB fundamental test process consists of 5 main activities To which of these belongs the task " Identifying necessary test data " ?

A.

Evaluating test criteria and reporting

B.

Test implementation and execution

C.

Test planning and control

D.

Test analysis and design

Question # 12

What of the following statements regarding walkthrough are NOT true?

A.

A walkthrough is lead by a moderator and requires pre-meeting preparation and post meeting follow up

B.

A walkthrough may take the form of scenarios, dry runs and peer group review

C.

The purpose of a walkthrough is to establish common understanding of a document and to find possible defects in it

D.

Pre-meeting preparation, documentation and distribution of results are optional for a walkthrough

Question # 13

Which of the following options explain why it is often beneficial to have an independent test function in an organisation?

A.

To improve defect finding during reviews and testing

B.

To ensure that developers adhere to coding standards

C.

To limit communication between developers and testers

D.

To provide better metrics for the stakeholders

Question # 14

Which of the following activities is appropriate to the test planning stage?

A.

Analysing the test basis

B.

Assigning resources for the planned activities

C.

Designing the test environments

D.

Writing a test execution schedule

Question # 15

A Test Manager conducts risk assessment for a project One of the identified risks is: ' ' The sub-contractor may fail to meet his commitment " If this risk materializes, it will lead to delay in completion of testing required for the current cycle.

Which of the following sentences correctly describes the risk?

A.

It is a project risk since successful completion of the project depends on successful and timely completion of the tests

B.

It is a product risk since any risk associated with development timelines is a product risk

C.

It is a product risk since default on part of the sub-contractor may lead to delay in release of the product

D.

It is no longer a risk for the Test Manager since an independent party (the sub-contractor) is now managing it

Question # 16

The following incident report that was generated during test of a web application

What would you suggest as the most important report improvement?

Defect detected date: 15.8.2010

Defect detected by. Joe Smith

Test level System test

Test case Area 5/TC 98

Build version: 2011-16.2

Defect description After having filled out all required fields in screen 1,1 click ENTER to continue to screen 2. Nothing happens, no system response at all.

A.

Add an impact analysis

B.

Add information about which developer should fix the bug

C.

Add the time stamp when the incident happened

D.

Add information about which web browser was used

Question # 17

Which of the following is NOT a deciding factor in determining the extent of testing required?

A.

Budget to do testing

B.

A particular tester involved in testing

C.

Level of risk of the product or features

D.

Time available to do testing

Question # 18

Given the following requirement:

Which of the following statements is NOT correct?

A.

7 and 13 are boundary values for the equivalence partition including age 10.

B.

Thursday is a valid input boundary value

C.

A minimum of 6 valid test cases are derived from boundary value analysis based on input age

D.

$3.01 is a valid output boundary value

Question # 19

" Statement Testing " is part of;

A.

Experience based testing

B.

Decision Testing

C.

Specification Based testing

D.

Structured based testing

Question # 20

Which of the following statements about decision tables are TRUE?

I. Generally, decision tables are generated for low risk test items

II. Test cases derived from decision tables can be used for component tests.

III. Several test cases can be selected for each column of the decision table.

IV. The conditions in the decision table represent negative tests generally.

A.

I, Ill

B.

II, Ill

C.

II, IV

D.

I, IV

Go to page: