Summer Sale Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: buysanta

Exact2Pass Menu

ISTQB Certified Tester Foundation Level (Syllabus 2018)

Last Update 14 hours ago Total Questions : 365

The ISTQB Certified Tester Foundation Level (Syllabus 2018) content is now fully updated, with all current exam questions added 14 hours ago. Deciding to include CTFL_Syll2018 practice exam questions in your study plan goes far beyond basic test preparation.

You'll find that our CTFL_Syll2018 exam questions frequently feature detailed scenarios and practical problem-solving exercises that directly mirror industry challenges. Engaging with these CTFL_Syll2018 sample sets allows you to effectively manage your time and pace yourself, giving you the ability to finish any ISTQB Certified Tester Foundation Level (Syllabus 2018) practice test comfortably within the allotted time.

Question # 51

You need to test a vending machine for light drinks The machine has a button for each of the drinks it contains

Pressing a button before inserting coins, will display the cost of the drink

Pressing the same button after inserting enough coins will dispense the drink and provide change if needed)

If the machine is out of the specific drink, and the button for this drink is pressed, the machine displays " Sold Out " (regardless if coins were inserted or not).

Which test technique is most suitable for this situation?

A.

State transition testing

B.

Equivalence class testing

C.

Boundary value testing

D.

Use-case testing

Question # 52

Which of the following BEST describes checklist-based testing?

A.

Checklist-based testing, while popular, provides little consistency and few guidelines concerning test case development

B.

Checklist-based testing may involve a list of tests based on what is important to the user as well as an understanding of why and how software fails

C.

Checklist-based testing is restricted to non-functional testing, including usability, performance, and security test

D.

Checklist-based testing includes formal tests from detailed lists of test conditions, allowing much repeatability

Question # 53

Which of the following activities do NOT belong to test implementation and execution?

A.

Checking if the preconditions of test execution have been met

B.

Logging of test results

C.

Test data generation

D.

Prioritizing test conditions

Question # 54

What is a typical benefit of use case testing?

A.

Finding failures in the possible states transitions

B.

Clearer identification of system equivalence partitioning

C.

Finding of failures in the business process flows, which highlight system use in the real world

D.

Identification of bugs in the system components.

Question # 55

A company purchased a new system which deals with all financial transactions in the company Which test types call for involvement of an expert from the financial department?

A.

Component testing

B.

Acceptance tests

C.

Maintenance testing

D.

System tests

Question # 56

How are statement testing and decision testing techniques similar?

A.

Both are specification-based testing techniques

B.

Both are experience-based testing techniques

C.

Both are structure-based testing techniques

D.

Both are black box test design techniques

Question # 57

Integration testing has following characteristics.

I. It can be done in incremental manner

II. It is always done after system testing

III. It includes functional tests

IV It includes non-functional tests

A.

I. l and IV are correct

B.

I Ill and IV are correct

C.

TI is correct

D.

II and III are correct

Question # 58

Which of the following BEST matches the attributes with a level of testing?

I. Stubs and drivers are often used

II The test environment should correspond to the production environment

III. Finding defects is not the main focus

IV Testing can be based on use cases

V. Testing is normally performed by testers

VI. Testing for functional and non-functional characteristics

A.

Component-V Integration - II System - IV Acceptance-VI

B.

Component -1 Integration - V System - II Acceptance - IV

C.

Component - IV Integration -1 System-VI Acceptance-V

D.

Component-VI Integration - IV System -1 Acceptance-III

Question # 59

Tests have been specified for the latest software release and users have prioritised these.

However, there are some dependencies between tests as shown in the table below (e.g. Test ID. ‘123’ cannot be run until Test ID. ‘456’ has been successfully completed).

Which test execution schedule best meets the prioritisation and dependency conditions?

A.

3, 5, 7, 10, 2, 4, 6, 8, 9, 1.

B.

5, 7, 4, 3, 9, 10, 1, 6, 8, 2.

C.

6, 1, 2, 9, 4, 3, 5, 7, 8, 10.

D.

1, 4, 3, 5, 2, 7, 9, 10, 6, 8.

Question # 60

Which of the following is an appropriate reason for maintenance testing?

A.

Bugs found in the field after upgrading the operation system

B.

Bugs found during system testing

C.

Bugs found during unit testing

D.

Bugs found during integration testing

Go to page: