You'll find that our CTFL_Syll2018 exam questions frequently feature detailed scenarios and practical problem-solving exercises that directly mirror industry challenges. Engaging with these CTFL_Syll2018 sample sets allows you to effectively manage your time and pace yourself, giving you the ability to finish any ISTQB Certified Tester Foundation Level (Syllabus 2018) practice test comfortably within the allotted time.

Question # 101

Functional and structural tests are alternative test types that may be used separately or together at which test level? [K1]

A.

At the component test level only

B.

At all test levels

C.

At integration testing and system testing levels only

D.

At all levels from integration testing to acceptance testing

Question # 102

Which statement BEST describes when test planning should be performed? [K1]

A.

Test planning is performed only once, at the beginning of the life cycle, andgenerates a Master Test Plan

B.

Test planning is performed at the beginning of the life cycle and again at the beginning of test execution

C.

Test planning is performed at the beginning of the life cycle and again at every test level

D.

Test planning is performed continuously in all life cycle processes and activities

Question # 103

Which of the following BEST defines static techniques? [K1]

A.

Executing the software work product

B.

Manually examining the code or project documentation

C.

Automated analysis of the code or project documentation

D.

Manual examination and automated analysis of code or project documentation

Question # 104

“Experience based " test design techniques, typically...

A.

Use decision tables to generate the Boolean test conditions to be executed.

B.

Identify the structure of the system or software at the component, integration or system level.

C.

Use the skill, intuition and experience of the tester to derive the test cases, using error guessing and exploratory testing.

D.

Establish traceability from test conditions back to the specifications and requirements.

Question # 105

Test objectives for systems testing of a safety critical system include completion of all outstanding defect correction. Regression testing is required following defect correction at all test levels. Which TWO of the following metrics would be MOST suitable for determining whether the test objective has been met? [K2]

a. Regression tests run and passed in systems testing

b. Incidents closed in systems testing

c. Planned tests run and passed in system testing

d. Planned tests run and passed at all levels of testing

e. Incidents raised and closed at all levels of testing

A.

a and e

B.

b and c

C.

d and e

D.

a and b

Question # 106

What factors should be considered to determine whether enough testing has been performed?

(i) The exit criteria.

(ii) The budget.

(iii) How big the test team is.

(iv) The product ' s risk profile.

(v) How good the testing tools are.

(vi) Sufficient details of the system status to allow decisions

A.

i and ii and iv and vi

B.

i and ii and iii and vi

C.

ii and iii and iv and v

D.

i and ii and v and vi

Question # 107

Which of the following are ' Exit Criteria? '

A.

Acceptance criteria, completion criteria, pass/fail criteria.

B.

Coverage of code, schedule, estimates of defect density.

C.

The last executable statement within a component.

D.

Cost overruns.

Question # 108

Which of the following test case design techniques is white box (structure-based)? [K1]

A.

Use case testing

B.

State transition testing

C.

Decision testing

D.

Equivalence partitioning

Question # 109

Before an invoice can be created, an account is required. Before an account can be set up, an account user is required (in order to set up the account). The software is delivered with a master user only, who can only create other types of users. The following test cases have been written to test the high-level structure of the software

a. Create an invoice

b. Amend an invoice

c. Process an invoice (send to customer)

d. Delete an invoice

e. Create an account

f. Create an account user

g. Amend an account user

h. Delete an account user

i. Amend an account

j. Delete an account

Which of the following test procedures would enable all tests to be run? [K3]

A.

f, g, a, c, b, d, e, i, j, h

B.

e, i, a, c, b, d, f, g, h, j

C.

e, i, f, g, a, c, b, d, h, j

D.

f, g, e, i, a, b, c, d, j, h