You'll find that our DCDC-002 exam questions frequently feature detailed scenarios and practical problem-solving exercises that directly mirror industry challenges. Engaging with these DCDC-002 sample sets allows you to effectively manage your time and pace yourself, giving you the ability to finish any BICSI Data Center Design Consultant – DCDC practice test comfortably within the allotted time.

Question # 21

What is the third preference regarding electricity supply?

A.

At Least Two Circuits From Same Power Grid But Different Substations And Separate Paths

B.

One Balanced Feeder Coordinated With Upstream Backup Feed

C.

One Circuit From Single Sub Station Fed Via Additional Path from Alternate Power Grid

D.

Two Balanced Feeds With Same Voltage Derived From A Single Distribution Station

Question # 22

What is the low temperature that must be maintained in a data center according to NEB standards?

A.

55 degrees

B.

60 degrees

C.

65 degrees

D.

70 degrees

E.

75 degrees

Question # 23

What is the minimum distance from the bottom of the access floor to the top of the cable tray?

A.

1 inch

B.

2 inches

C.

3 inches

D.

4 inches

E.

5 inches

Question # 24

What should be done with unused rack space?

A.

it should be filled with blanking devices to reduce non-functional airflow

B.

it should be used for additional storage purposes

C.

it should be left open to allow for better ventilation

D.

they should be turned off to save energy costs

Question # 25

What is the minimum separation distance of underground telecommunications and utility cabling in same route?

A.

2 feet minimum along entire route

B.

6 feet minimum along entire route

C.

no need for separation as long as they are enclosed in different conduit systems.

D.

none of the above

Question # 26

what is the ASHRAE maximum relative humidity recommended.

A.

45%

B.

50%

C.

55%

D.

60%

Question # 27

What is the minimum separation distance for redundant utility service feeds

A.

4 feet along entire route

B.

22 feet along entire route

C.

44 feet along entire route

D.

66 Feet Along the Entire Route

Question # 28

What type of slope is considered too extreme for a data center site?

A.

5%

B.

10%

C.

15%

D.

20%

Question # 29

What is minimum recommended generator fuel storage amount?

A.

enough to run 4 to 16 hours at full load

B.

enough to run 24 to 36 hours at full load

C.

enough to run 48-72 hours at full load

D.

enough to run up-to a week at full load

Question # 30

What are the equipment clearance/access requirements when designing the door openings and loading dock areas for a data center?

Go to page: