Summer Sale Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: buysanta

Exact2Pass Menu

BICSI Registered Communications Distribution Designer - RCDD

Last Update 16 hours ago Total Questions : 361

The BICSI Registered Communications Distribution Designer - RCDD content is now fully updated, with all current exam questions added 16 hours ago. Deciding to include RCDD-002 practice exam questions in your study plan goes far beyond basic test preparation.

You'll find that our RCDD-002 exam questions frequently feature detailed scenarios and practical problem-solving exercises that directly mirror industry challenges. Engaging with these RCDD-002 sample sets allows you to effectively manage your time and pace yourself, giving you the ability to finish any BICSI Registered Communications Distribution Designer - RCDD practice test comfortably within the allotted time.

Question # 1

You are placing two 423 mm (19 in) relay racks with a 152 mm (6 in) vertical management panel on each end and a 12 in vertical cable management panel between the racks. The rack lineup begins against a wall in the room. What is the MINIMUM room size required?

A.

1.83 m (6 ft) x 2.4 m (8 ft)

B.

2.1 m (7 ft) x 2.4 m (8 ft)

C.

2.4 m (8 ft) x 2.4 m (8 ft)

D.

2.4 m (8 ft) x 3.0 m (10 ft)

E.

3.0 m (10 ft) x 3.0 m (10 ft)

Question # 2

You are designing a cabling system for a chemical plant. What type of device is needed to prevent the spread of fire along the cable other than the barrier penetrations?

A.

Fire break

B.

Fire shield

C.

Fire stop

D.

Fire wall

Question # 3

Within building automation hardware systems, there is a hierarchical system of micro processor based controllers. Which type of controller is used to provide limited port capacity for connection of sensors, support, and execution of DDC programs, and usually operates in stand alone mode?

A.

System level controller

B.

Field level controller

C.

Management level processor

D.

Protocol management system

E.

DDC manager

Question # 4

What is the expected life cycle, in years, of building automation system within a building structure with a life cycle of 40+ years?

A.

1 to 2

B.

2 to 4

C.

5 to 7

D.

8 to 12

E.

12 to 15

Question # 5

Within a heating ventilation and air conditioning automatic control system, what do the letters DDC stand for?

A.

Dual division charger

B.

Direct digital control

C.

Diverse duct center

D.

Direct drive cable

E.

Differential diffuser control

Question # 6

What is the expected lumenance value, in watts, of a 200 watt fluorescent lamp after three years?

A.

120 watts

B.

140 watts

C.

160 watts

D.

180 watts

E.

200 watts

Question # 7

If you are using a building automation system (BAS) protocol operating on RF media at 19,200 b/s in the 868 MHz band, which protocol are you using?

A.

European installation bus

B.

Lon Talk

C.

MODBUS

D.

LonMark

E.

Modicon

Question # 8

What is the MINIMUM clearance needed between the front of the telephone booth and any wall or fixture for most installations?

A.

300 mm (12 in)

B.

450 mm (18 in)

C.

610 mm (24 in)

D.

914 mm (36 in)

E.

2.4 m (8 ft)

Question # 9

What is the MINIMUM distance from the edge of a pool or other water hazards for a weatherproof enclosure?

A.

1 m (3 ft)

B.

2 m (7 ft)

C.

4 m (13 ft)

D.

6 m (20 ft)

E.

10 m (30 ft)

Question # 10

Which type of protection for electrical power stations provide isolation against a rise in potential of station ground and also provide drainage protection against longitudinally-induced voltages?

A.

Isolating transformers

B.

Neutralizing transformers

C.

Mutual drainage reactors

D.

Unit-type neutralizing transformers

E.

2-winding neutralizing transformers

Go to page: