Spring Sale Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: buysanta

Exact2Pass Menu

ISTQB Certified Tester Advanced Level - Test Analyst (CTAL-TACore)v3.1.2

Last Update 3 hours ago Total Questions : 95

The ISTQB Certified Tester Advanced Level - Test Analyst (CTAL-TACore)v3.1.2 content is now fully updated, with all current exam questions added 3 hours ago. Deciding to include ISTQB-CTAL-TA practice exam questions in your study plan goes far beyond basic test preparation.

You'll find that our ISTQB-CTAL-TA exam questions frequently feature detailed scenarios and practical problem-solving exercises that directly mirror industry challenges. Engaging with these ISTQB-CTAL-TA sample sets allows you to effectively manage your time and pace yourself, giving you the ability to finish any ISTQB Certified Tester Advanced Level - Test Analyst (CTAL-TACore)v3.1.2 practice test comfortably within the allotted time.

Question # 21

For an ATM banking project the following applies: "When the user first inserts a valid credit card, the system considers the user to be in an unauthenticated state. When requesting a cash advance, the user must be in an authenticated state. The user authenticates by entering the correct PIN code for the card they have used. During the user authentication, the system shall allow the user to enter their PIN code up to three times before failing the authentication and rejecting the card. On the first and second try, the system shall prompt the user to re-enter the PIN code " Suppose you are concerned that, depending on the number of invalid PIN codes entered, the system may behave incorrectly. Which of the following test design techniques is specifically targeted at finding such failures?

A.

Equivalence partitioning

B.

Pairwise testing

C.

State transition testing using 1-switch coverage

D.

Classification tree technique

Question # 22

Consider the following user story: As a student, I want to be able to buy a parking pass (priority: high) Acceptance criteria

- The student will not receive the parking pass if the payment is insufficient.

- Only registered students can buy a parking pass.

- The student can only buy one parking pass each month.

Which of the following checklist items would result in finding a defect for the user story?

A.

Are the acceptance criteria defined and testable?

B.

Does the story follow the commonly used format "As a < > , I want < > so that < > "?

C.

Is the story prioritized?

D.

Is the story written from the view of the person who requested it?

Question # 23

An energy monitor in-home display device has been designed to interact with the home's lighting system and automatically dim bedroom lights when the daily energy budget has reached 90%. A defect has been found causing lights to dim at 80%. What type of testing would MOST likely have uncovered this defect?

SELECT ONE OPTION

A.

Interoperability testing

B.

Functional appropriateness testing

C.

Accessibility testing

D.

Adaptability testing

Question # 24

Although usability is an important aspect for a new planning system, due to availability constraints, the usability evaluation shall be performed without Which of the following is a usability technique that can be applied in this situation?

A.

Usability review, e.g., heuristic evaluation

B.

Usability prototyping

C.

Usability survey

D.

Usability lab sessions

Question # 25

Which TWO of the following are MOST likely to be defects found as part of portability testing?

a) Insufficient, unclear installation or de-installation instructions

b) Clumsy screen navigation and input screen labeling

c) Inability to log on as an administrator

d) Time out errors when entering incorrect login details

e) The stock control barcodes cannot be read by the replaced barcode scanner

SELECT ONE OPTION

A.

a, e

B.

a, d

C.

c, e

D.

b, d

Question # 26

As a Test Analyst, you have been given a set of requirements that have been defined for the payment module of a new public transport system The set includes the following requirements:

P101 The product shall calculate the lowest fare for the destination considering day of week and time, (priority: medium)

P102 The product shall compare the traveler's payment with the calculated payment (priority: high)

P103 The product shall provide feedback if the payment is not sufficient (priority: high)

P104 The product will process payments within 20 seconds at all priority 1 stations during peak hours (priority high)

Which set of requirements will typically be tested by a Test Analyst?

A.

P101,P102, P103

B.

P101, P102, P104

C.

P101, P103, P104

D.

P102, P103, P104

Question # 27

Which of the following appropriate tasks for the Test Analyst is performed during the test analysis phase?

A.

Review test estimates

B.

Examine the test basis

C.

Create a test execution schedule

D.

Evaluate status against exit criteria

Question # 28

You are testing an ATM based on the following use

ATM start screen is showing

1. The user inserts card

2. The user types in PIN

3 The user selects cash with receipt'

4. The user selects €50

5. The user selects no further service' Expected results

- The ATM provides €50 to the user

- The ATM returns the card and balance slip

- The ATM clears the screen

- The ATM returns to start menu

You are asked to review this use case.

You are asked to review this use case.

What is the most important information that is missing from this use case?

A.

Nothing has been defined for expected response times.

B.

The use case should also include alternative behaviour.

C.

More test cases are needed to achieve the minimum acceptable level of coverage.

D.

Expected results not clearly defined

Go to page: