Summer Sale Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: buysanta

Exact2Pass Menu

LEED Green Associate GAFRE Exam (LEED GA)

Last Update 8 hours ago Total Questions : 430

The LEED Green Associate GAFRE Exam (LEED GA) content is now fully updated, with all current exam questions added 8 hours ago. Deciding to include LEED-Green-Associate practice exam questions in your study plan goes far beyond basic test preparation.

You'll find that our LEED-Green-Associate exam questions frequently feature detailed scenarios and practical problem-solving exercises that directly mirror industry challenges. Engaging with these LEED-Green-Associate sample sets allows you to effectively manage your time and pace yourself, giving you the ability to finish any LEED Green Associate GAFRE Exam (LEED GA) practice test comfortably within the allotted time.

Question # 21

When determining total parking capacity available to building users, which of the following must be included?

A.

Motorbike and bicycle parking spaces

B.

Parking spaces for fleet vehicles used for business

C.

On-street parking spaces on public rights of way

D.

New and existing surface parking spaces

Question # 22

Which of the following strategies prioritizes cost-effectiveness when designing a LEED project?

A.

Onsite renewable systems

B.

Enhanced Commissioning (Cx)

C.

Measuring and verifying systems performance for one year

D.

Applying an integrative design process

Question # 23

Which of the following addresses indoor Environmental Quality?

A.

ASHRAE901

B.

ASHRAE 62 1

C.

Energy Policy Act of 1992 (EPAct of 1992)

D.

The Montreal Protocol

Question # 24

Which of the following techniques IS recommended for preventing the negative effects of indoor pollutants?

A.

Deep cleaning all surfaces during occupant move-in

B.

Keeping material containers open during construction

C.

Specifying and installing low-emitting materials at the source

D.

Keeping doors and windows open after installation of interior finishes

Question # 25

A new community center is being designed to meet LEED standards for optimal resource efficiency. Which strategy will help the project team achieve LEED certification by optimizing energy efficiency and promoting sustainable operations?

A.

Installing solar panels and a geothermal heating system

B.

Applying reflective coatings to external walls and surfaces

C.

Utilizing centralized HVAC for consistent temperature

D.

Increasing exterior lighting power for safety

Question # 26

A developer is planning to build an office tower and wants it to achieve LEED Platinum certification. The project site is located in an urban area, near public transit and bicycle lanes. The project team is familiar with LEED and aims to excel in the Sustainable Sites (SS), Water Efficiency (WE), Energy and Atmosphere (EA), and Materials and Resources (MR) credit categories. To maximize points in the SS credit category, which of the following strategies should the project team prioritize?

A.

Implement a green roof to manage rainwater

B.

Design to optimize energy performance

C.

Use rapidly renewable materials

D.

Install high-efficiency plumbing fixtures

Question # 27

In a large site that has a short, intense rainy season and a long, dry season, what component of a collected rainwater irrigation system is most likely to make it cost prohibitive over a conventional system?

A.

Irrigation piping systems

B.

Irrigation control systems

C.

Rainwater storage cisterns

D.

Landscaping plant selection

Question # 28

Which of the following is an effective way to identify occupant comfort issues in a space based on LEED best practices?

A.

Install energy meters in the building

B.

Discuss potential issues with building owner

C.

Conduct an occupant comfort survey with all building occupants

D.

Wait for occupants to alert facilities management team of issues

Question # 29

To reduce the use of potable water for irrigation, which of the following factors should be taken into consideration?

A.

Minimize pervious areas

B.

Minimize green roof area

C.

Maximize use of native species

D.

Maximize use of pervious pavement

Question # 30

Flush out process is performed to remove which of the following?

A.

voc

B.

Waste

C.

Graywater

D.

Blackwater

Go to page: