You'll find that our LEED-Green-Associate exam questions frequently feature detailed scenarios and practical problem-solving exercises that directly mirror industry challenges. Engaging with these LEED-Green-Associate sample sets allows you to effectively manage your time and pace yourself, giving you the ability to finish any LEED Green Associate GAFRE Exam (LEED GA) practice test comfortably within the allotted time.

Question # 71

Which of the following credit categories does not have a prerequisite?

A.

Water Efficiency

B.

Materials and Resources

C.

Location and Transportation

D.

Indoor Environmental Quality

Question # 72

What is the purpose of life-cycle costing in integrative process planning?

A.

To evaluate both purchase and operating costs along with savings over the project lifespan

B.

To determine the initial costs of construction without considering future expenses

C.

To ensure that operational costs are minimized at the expense of higher purchase costs

D.

To compare only the environmental impacts of materials

Question # 73

When selecting the appropriate LEED rating system for a project, which of the following processes should the project team use if the project falls under multiple rating systems?

A.

Refer to LEED’s Minimum Program Requirements for a final decision

B.

Perform a comprehensive environmental impact study

C.

Use the Rating System Selection Guidance

D.

Select the rating system with the fewest prerequisites

Question # 74

Which of the following is a prerequisite in LEED v4 Water Efficiency category?

A.

Rainwater Management

B.

Cooling Tower Water Use

C.

Building-Level Water Metering

D.

Building-Level Energy Metering

Question # 75

In which LEED rating category does a Built Project fall into?

A.

LEED for Building Design and Construction

B.

LEED for Interior Design and Construction

C.

LEED for Operations and Maintenance

D.

LEED for Neighborhood Development

Question # 76

The intent of waste management in the Materials and Resources credit category is to

A.

specify the use of green materials

B.

promote the use of rapidly renewable resources

C.

reduce the amount of waste and toxins hauled to landfills

D.

increase the use of pre-consumer/post-consumer recycled content

Question # 77

Which of the following project types and scopes are addressed by LEED rating systems?

A.

LEED Operations & Maintenance: Schools

B.

LEED Interior Design and Construction: Data Centers

C.

LEED Building Design and Construction: Existing Buildings

D.

LEED Neighborhood Development: Warehouses and Distribution

Question # 78

LEED certification steps generally proceed in which of the following order?

A.

Project Registration, Application Preparation, Submission, Application Review, Certification

B.

Application Preparation, Application Review, Project Registration, Submission, Certification

C.

Select LEED rating system, Submission, Application Review, Project Registration, Certification

D.

Application Preparation, Project Registration, Application Review, Submission, Certification

Question # 79

A salvaged wood door from another site qualifies under what Materials and Resources sustainable criteria?

A.

Certified wood

B.

Materials reuse

C.

Bio-based materials

D.

Waste diversion

Question # 80

Which of the following is a tradable commodity representing proof that a unit of electricity was generated from a renewable source?

A.

Tradable Energy Credit (TEC)

B.

Renewable Wind Certificate

C.

Renewable Energy Certificate

D.

Certificate for Innovative Renewables