You'll find that our LEED-Green-Associate exam questions frequently feature detailed scenarios and practical problem-solving exercises that directly mirror industry challenges. Engaging with these LEED-Green-Associate sample sets allows you to effectively manage your time and pace yourself, giving you the ability to finish any LEED Green Associate GAFRE Exam (LEED GA) practice test comfortably within the allotted time.

Question # 61

The LEED rating system was designed to

A.

serve as a floor tor local Green Building codes

B.

serve as a ceiling for local building codes

C.

serve as a complement to local building codes

D.

serve as a model National Green Building code

Question # 62

In addition to the temperature and humidity, what is another factor to consider when implementing thermal comfort strategies?

A.

Daylight

B.

Acoustics

C.

Air movement

D.

Green cleaning

Question # 63

The result of proper design and operation of buildings and neighborhoods is an increase in energy

A.

supply

B.

demand

C.

efficiency

D.

consumption

Question # 64

What green building objective does utilizing high efficiency water fixtures achieve?

A.

Preventing stormwater pollution

B.

Conserving the Earth ' s potable water supply

C.

Providing adequate watering for indigenous plants

D.

Utilizing more unused graywater for flushing water closets

Question # 65

Which of the following projects would be appropriate to pursue LEED certification according to the Minimum Program Requirements (MPRs)?

A.

A new parking garage construction occupying a total of 15,000 ft² gross floor area

B.

A new building that will occupy 12,000 ft² gross floor area on previously developed land

C.

A historic building intended for restoration occupying 900 ft² of gross floor area

D.

A movable house attached to a trailer that can be moved from state to state

Question # 66

At what phase should the charrette take place?

A.

Post commissioning

B.

During the design process

C.

At the Beginning of the project

D.

During the construction process

Question # 67

Which credit category attempts to reduce light pollution and discourages the development of previously undeveloped land?

A.

Regional Priority

B.

Sustainable Sites

C.

Energy and Atmosphere

D.

Location and Transportation

Question # 68

Which of the following team members should participate in the initial evaluation to determine which level of LEED certification to target?

A.

Owner

B.

Zoning Official

C.

Project Safety Officer

D.

Green Business Certification Inc. (GBCI) Certification Reviewer

Question # 69

The water use reduction for a project is determined by finding the difference between the baseline conditions and the

A.

local water usage rate

B.

project occupancy type

C.

calculated installed case

D.

permitted maximum water usage

Question # 70

Minimizing impervious surfaces, protecting soils, and enhancing native vegetation are all strategies that:

A.

Optimize outdoor water use

B.

Reduce light pollution

C.

Decrease construction activity pollution

D.

Improve rainwater management