LEED Green Associate Exam (LEED GA)

Last Update 19 hours ago Total Questions : 320

The LEED Green Associate Exam (LEED GA) content is now fully updated, with all current exam questions added 19 hours ago. Deciding to include LEED-Green-Associate practice exam questions in your study plan goes far beyond basic test preparation.

You'll find that our LEED-Green-Associate exam questions frequently feature detailed scenarios and practical problem-solving exercises that directly mirror industry challenges. Engaging with these LEED-Green-Associate sample sets allows you to effectively manage your time and pace yourself, giving you the ability to finish any LEED Green Associate Exam (LEED GA) practice test comfortably within the allotted time.

Question # 4

Which of the following represents a unit of carbon dioxide equivalent that is reduced, avoided, or sequestered to compensate for emissions occurring elsewhere?

A.

Green power

B.

Demand response

C.

Carbon offsets

D.

Renewable energy

Question # 5

What is the scope of the LEED impact category component Protect Human Health from Direct Exposure to Negative Health Impacts?

A.

Building occupants during use and demolition phase of the building cycle, within the project boundary

B.

Occupants and construction crew during construction or renovation phase of the building cycle, within the project boundary

C.

Design and construction crew during the construction phase, within the project boundary and excluding its immediate surroundings

D.

Building occupants and design and construction crew during the construction phase and use phase ol the building cycle, within the project boundary and its immediate surroundings

Question # 6

In a large site that has a short, intense rainy season and a long, dry season, what component of a collected rainwater irrigation system is most likely to make it cost prohibitive over a conventional system?

A.

Irrigation piping systems

B.

Irrigation control systems

C.

Rainwater storage cisterns

D.

Landscaping plant selection

Question # 7

The LEED Pilot credit library plays an important role in the continuous evolution of LEED by

A.

developing new credits for U.S. projects only

B.

achieving the next threshold for exemplary performance

C.

limiting the number of times that a credit category appears in the rating system

D.

providing U.S. Green Building Council (USGBC) with feedback on achievability of proposed credits

Question # 8

What do team members enhance by collaboration during the integrative process?

A.

Project duration

B.

Life-cycle costs

C.

Construction costs

D.

Efficiency and effectiveness of systems

Question # 9

In addition to the temperature and humidity, what is another factor to consider when implementing thermal comfort strategies?

A.

Daylight

B.

Acoustics

C.

Air movement

D.

Green cleaning

Question # 10

What plumbing fixture eliminates water use?

A.

Ultrasonic toilet

B.

WaterSense labeled toilet

C.

Low-flow lavatory

D.

Composting toilet

Go to page: