Spring Sale Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: buysanta

Exact2Pass Menu

BICSI Registered Communications Distribution Designer - RCDD

Last Update 15 hours ago Total Questions : 361

The BICSI Registered Communications Distribution Designer - RCDD content is now fully updated, with all current exam questions added 15 hours ago. Deciding to include RCDD-002 practice exam questions in your study plan goes far beyond basic test preparation.

You'll find that our RCDD-002 exam questions frequently feature detailed scenarios and practical problem-solving exercises that directly mirror industry challenges. Engaging with these RCDD-002 sample sets allows you to effectively manage your time and pace yourself, giving you the ability to finish any BICSI Registered Communications Distribution Designer - RCDD practice test comfortably within the allotted time.

Question # 71

A(n) ________ system is considered a mechanical firestop.

A.

Cementitious

B.

Cable transit

C.

Firestop block

D.

Intumescent sheet

Question # 72

How much area of wall space is needed in the telecommunications room (TR) to support a nurse call system?

A.

1.2m x 1.2 m (4 ft x 4 ft)

B.

1.2m x 2.4 m (4 ft x 8 ft)

C.

2.4 m x 2.4 m (8 ft x 8 ft)

D.

2.4 m x 3.6 m (8 ft x 12 ft)

Question # 73

You are designing a nurse call system for an assisted care facility. What type of nurse call system would best suit the needs for the facility?

A.

Audiovisual system

B.

Staff emergency system

C.

Tone/Visual system

D.

Bedside system

Question # 74

The ________ system is an application used for storing and viewing captured digital radiology image files.

A.

CCU

B.

ICU

C.

DICOM

D.

PACS

Question # 75

Which of the following is used to create an electronic signal that can be sent to the central nurse call equipment?

A.

Headend module

B.

Initiation device

C.

Notification device

D.

Two tone device

Question # 76

You are designing a nurse call system for a health care facility. The system will have emergency call switches. What is the first step you should take in designing the nurse call system?

A.

Properly size the supporting TR to accommodate the headend system

B.

Program the headend device for the various call switches that will be used

C.

Perform a risk assessment to determine call switch locations

D.

Perform a site survey to verify the pathways that will connect the headend device with the call switches

Question # 77

When designing a fiber backbone using cable with an armored sheath, a major consideration that you must address is:

A.

Type of metal used in the sheath

B.

Strength of the armored sheath

C.

Amount of aluminum contained in the armored sheath

D.

Amount of steel in the sheath as rust is an issue

E.

Bonding and grounding of the armored sheath

Question # 78

When installing a heavy backbone cabling vertically, recommended methods of securing the cable include all of the following EXCEPT:

A.

Tie wraps

B.

Brackets

C.

Steel or plastic straps

D.

Collar or mesh basket grips

E.

Steel cable ties

Question # 79

The MINIMUM recommended lighting requirement in a telecommunications room (TR) at the point of cable terminations is:

A.

150 lux

B.

300 lux

C.

500 lux

D.

750 lux

E.

1000 lux

Question # 80

At a minimum, convenience receptacles in an ER or TR are to be located ________ AFF.

A.

150 mm (6 in)

B.

300 mm (12 in)

C.

375 mm (15 in)

D.

450 mm (18 in)

Go to page: