You'll find that our DCDC-003.1 exam questions frequently feature detailed scenarios and practical problem-solving exercises that directly mirror industry challenges. Engaging with these DCDC-003.1 sample sets allows you to effectively manage your time and pace yourself, giving you the ability to finish any BICSI Data Center Design Consultant - DCDC practice test comfortably within the allotted time.

Question # 4

What is the recommended level of redundancy for a critical power system in a Tier III data center?

A.

N

B.

N+1

C.

2N

D.

2N+1

E.

3N

Question # 5

what is the second preference regarding utility service

A.

At least four circuits each from different distribution stations but fed via common feeders B. Two balanced feeds with different voltages derived from a single distribution station

B.

One balanced feeder coordinated with upstream backup feed D. At least One Circuit from two Separate Substations and Different Voltage Levels

Question # 6

What are three primary considerations in designing the power systems space plan?

A.

Energy utilization, efficiency of cooling and redundant generators

B.

Physical security, environmental monitoring, backup power source

C.

Reduce transmission loss, conduit path minimizing & spacing requirement for system

D.

Leakage current control, firewall protection & hardening redundancy

Question # 7

What are the speed and distance limitations of ESCON?

A.

1 Gbps @ up to 100m

B.

10 Gbps @ up to 40km

C.

17 MB/s @ up to 60km

D.

100 Mbps @ up to 20km

Question # 8

What is the flame index spread rating required for all materials hosted in a containment system?

A.

0

B.

10

C.

25

D.

50

Question # 9

How do you calculate thermal load in a data center?

A.

IT Thermal Output + Cooling System

B.

IT Thermal Output + Lighting System

C.

IT Thermal Output + PDU System

D.

IT Thermal Output + Cooling System + Lighting System

E.

IT Thermal Output + Cooling System + Lighting System + PDU System

Question # 10

where is the storage room located?

A.

away from computer room, adjacent to equipment entrance at data center

B.

next door to computing area

C.

outermost point of Data Centre

D.

Near Backup Generator

E.

All